Chemical Decontamination at Browns Ferry Unit 1
In May, 2002, the Tennessee Valley Authority's (TVA) Board of Directors approved the recovery and restart of Unit 1 at Browns Ferry Nuclear Station. As an initial step in the site characterization and restart feasibility review, a majority of the primary reactor circuit was chemically decontaminated. Close cooperation between TVA and vendor personnel resulted in project completion ahead of schedule with outstanding results. The final average decontamination factors were excellent, and the final dose rates were very low, with contact readings on most points between one and three mRem/hr. In addition to allowing TVA to do a complete and thorough job of determining the feasibility of the Unit 1 restart, the decontamination effort will greatly reduce personnel exposure during plant recovery, both whole body exposure to gamma radiation and airborne exposure during pipe replacement efforts. The implementation of lessons learned from previous decontamination work performed at Browns Ferry, as well as decontamination efforts at other plants aided greatly in the success. Specific items of note are: (1) The initial leak check of the temporary decontamination system should include ancillary systems such as the spent resin system, as well as the main circulation loop. This could save time and dose exposure if leaks are discovered before the use of such systems is required. (2) Due to the quick turnaround time from the award of contract, a vendor representative was onsite early in the project to help with engineering efforts and procedures. This aided greatly in completing preparations for the decontamination. (3) The work was performed under a single maintenance activity. This resulted in great craft and plant support. (4) The constant coverage by the site's decontamination flush directors provided timely plant support and interface. (5) The FPC system isolation and back flushing to prevent residual chemicals from being left in the FPC system should have been addressed in more detail in the pre-engineering study to prevent delays during the final system cleanup.
- Research Organization:
- Tennessee Valley Authority, Knoxville, TN (US)
- Sponsoring Organization:
- none (US)
- OSTI ID:
- 821050
- Journal Information:
- Nuclear Plant Journal, Vol. 21, Issue 5; Other Information: PBD: 1 Sep 2003; ISSN 0892-2055
- Country of Publication:
- United States
- Language:
- English
Similar Records
Demonstration testing of a surveillance robot at Browns Ferry Nuclear Plant: Analysis of costs and benefits
Browns Ferry Nuclear Plant annual radiological environmental operating report, 1990