Title: Advanced underground Vehicle Power and Control: The locomotive Research Platform

Abstract

Develop a fuelcell mine locomotive with metal-hydride hydrogen storage. Test the locomotive for fundamental limitations preventing successful commercialization of hydride fuelcells in underground mining. During Phase 1 of the DOE-EERE sponsored project, FPI and its partner SNL, completed work on the development of a 14.4 kW fuelcell power plant and metal-hydride energy storage. An existing battery-electric locomotive with similar power requirements, minus the battery module, was used as the base vehicle. In March 2001, Atlas Copco Wagner of Portland, OR, installed the fuelcell power plant into the base vehicle and initiated integration of the system into the vehicle. The entire vehicle returned to Sandia in May 2001 for further development and integration. Initial system power-up took place in December 2001. A revision to the original contract, Phase 2, at the request of DOE Golden Field Office, established Vehicle Projects LLC as the new prime contractor,. Phase 2 allowed industry partners to conduct surface tests, incorporate enhancements to the original design by SNL, perform an extensive risk and safety analysis, and test the fuelcell locomotive underground under representative production mine conditions. During the surface tests one of the fuelcell stacks exhibited reduced power output resulting in having to replace both fuelcellmore » stacks. The new stacks were manufactured with new and improved technology resulting in an increase of the gross power output from 14.4 kW to 17 kW. Further work by CANMET and Hatch Associates, an engineering consulting firm specializing in safety analysis for the mining industry, both under subcontract to Vehicle Projects LLC, established minimum requirements for underground testing. CANMET upgraded the Programmable Logic Control (PLC) software used to monitor and control the fuelcell power plant, taking into account locomotive operator's needs. Battery Electric, a South Africa manufacturer, designed and manufactured (at no cost to the project) a new motor controller capable of operating the higher rpm motor and different power characteristics of the fuelcells. In early August 2002, CANMET, with the technical assistance of Nuvera Fuel Cells and Battery Electric, installed the new PLC software, installed the new motor controller, and installed the new fuelcell stacks. After minor adjustments, the fuelcell locomotive pulled its first fully loaded ore cars on a surface track. The fuelcell-powered locomotive easily matched the battery powered equivalent in its ability to pull tonnage and equaled the battery-powered locomotive in acceleration. The final task of Phase 2, testing the locomotive underground in a production environment, occurred in early October 2002 in a gold mine. All regulatory requirements to allow the locomotive underground were completed and signed off by Hatch Associates prior to going underground. During the production tests, the locomotive performed flawlessly with no failures or downtime. The actual tests occurred during a 2-week period and involved moving both gold ore and waste rock over a 1,000 meter track. Refueling, or recharging, of the metal-hydride storage took place on the surface. After each shift, the metal-hydride storage module was removed from the locomotive, transported to surface, and filled with hydrogen from high-pressure tanks. The beginning of each shift started with taking the fully recharged metal-hydride storage module down into the mine and re-installing it onto the locomotive. Each 8 hour shift consumed approximately one half to two thirds of the onboard hydrogen. This indicates that the fuelcell-powered locomotive can work longer than a similar battery-powered locomotive, which operates about 6 hours, before needing a recharge.« less

Authors:
Publication Date:
Research Org.:
Golden Field Office, Golden, CO (US)
Sponsoring Org.:
USDOE Office of Energy Efficiency and Renewable Energy (EE) (US)
OSTI Identifier:
816032
Report Number(s):
FC36-99GO10458
TRN: US200320%%187
DOE Contract Number:
/GO/10458
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 28 Jan 2003
Country of Publication:
United States
Language:
English
Subject:
08 HYDROGEN; 30 DIRECT ENERGY CONVERSION; 33 ADVANCED PROPULSION SYSTEMS; AUTOMOBILES; ENERGY STORAGE; FUEL CELLS; GOLD ORES; HYDROGEN STORAGE; LOCOMOTIVES; MINERAL INDUSTRY; POWER PLANTS; SAFETY ANALYSIS; UNDERGROUND MINING; ELECTRIC-POWERED VEHICLES; UNDERGROUND

Citation Formats

Vehicle Projects LLC. Advanced underground Vehicle Power and Control: The locomotive Research Platform. United States: N. p., 2003. Web. doi:10.2172/816032.
Vehicle Projects LLC. Advanced underground Vehicle Power and Control: The locomotive Research Platform. United States. doi:10.2172/816032.
Vehicle Projects LLC. Tue . "Advanced underground Vehicle Power and Control: The locomotive Research Platform". United States. doi:10.2172/816032. https://www.osti.gov/servlets/purl/816032.
@article{osti_816032,
title = {Advanced underground Vehicle Power and Control: The locomotive Research Platform},
author = {Vehicle Projects LLC},
abstractNote = {Develop a fuelcell mine locomotive with metal-hydride hydrogen storage. Test the locomotive for fundamental limitations preventing successful commercialization of hydride fuelcells in underground mining. During Phase 1 of the DOE-EERE sponsored project, FPI and its partner SNL, completed work on the development of a 14.4 kW fuelcell power plant and metal-hydride energy storage. An existing battery-electric locomotive with similar power requirements, minus the battery module, was used as the base vehicle. In March 2001, Atlas Copco Wagner of Portland, OR, installed the fuelcell power plant into the base vehicle and initiated integration of the system into the vehicle. The entire vehicle returned to Sandia in May 2001 for further development and integration. Initial system power-up took place in December 2001. A revision to the original contract, Phase 2, at the request of DOE Golden Field Office, established Vehicle Projects LLC as the new prime contractor,. Phase 2 allowed industry partners to conduct surface tests, incorporate enhancements to the original design by SNL, perform an extensive risk and safety analysis, and test the fuelcell locomotive underground under representative production mine conditions. During the surface tests one of the fuelcell stacks exhibited reduced power output resulting in having to replace both fuelcell stacks. The new stacks were manufactured with new and improved technology resulting in an increase of the gross power output from 14.4 kW to 17 kW. Further work by CANMET and Hatch Associates, an engineering consulting firm specializing in safety analysis for the mining industry, both under subcontract to Vehicle Projects LLC, established minimum requirements for underground testing. CANMET upgraded the Programmable Logic Control (PLC) software used to monitor and control the fuelcell power plant, taking into account locomotive operator's needs. Battery Electric, a South Africa manufacturer, designed and manufactured (at no cost to the project) a new motor controller capable of operating the higher rpm motor and different power characteristics of the fuelcells. In early August 2002, CANMET, with the technical assistance of Nuvera Fuel Cells and Battery Electric, installed the new PLC software, installed the new motor controller, and installed the new fuelcell stacks. After minor adjustments, the fuelcell locomotive pulled its first fully loaded ore cars on a surface track. The fuelcell-powered locomotive easily matched the battery powered equivalent in its ability to pull tonnage and equaled the battery-powered locomotive in acceleration. The final task of Phase 2, testing the locomotive underground in a production environment, occurred in early October 2002 in a gold mine. All regulatory requirements to allow the locomotive underground were completed and signed off by Hatch Associates prior to going underground. During the production tests, the locomotive performed flawlessly with no failures or downtime. The actual tests occurred during a 2-week period and involved moving both gold ore and waste rock over a 1,000 meter track. Refueling, or recharging, of the metal-hydride storage took place on the surface. After each shift, the metal-hydride storage module was removed from the locomotive, transported to surface, and filled with hydrogen from high-pressure tanks. The beginning of each shift started with taking the fully recharged metal-hydride storage module down into the mine and re-installing it onto the locomotive. Each 8 hour shift consumed approximately one half to two thirds of the onboard hydrogen. This indicates that the fuelcell-powered locomotive can work longer than a similar battery-powered locomotive, which operates about 6 hours, before needing a recharge.},
doi = {10.2172/816032},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jan 28 00:00:00 EST 2003},
month = {Tue Jan 28 00:00:00 EST 2003}
}

Technical Report:

Save / Share:
  • The goal of the present technology development was to increase the efficiency of internal combustion engines while minimizing the energy penalty of meeting emissions regulations. This objective was achieved through experimentation and the development of advanced combustion regimes and emission control strategies, coupled with advanced petroleum and non-petroleum fuel formulations. To meet the goals of the project, it was necessary to improve the efficiency of expansion work extraction, and this required optimized combustion phasing and minimized in-cylinder heat transfer losses. To minimize fuel used for diesel particulate filter (DPF) regeneration, soot emissions were also minimized. Because of the complex naturemore » of optimizing production engines for real-world variations in fuels, temperatures and pressures, the project applied high-fidelity computing and high-resolution engine experiments synergistically to create and apply advanced tools (i.e., fast, accurate predictive models) developed for low-emission, fuel-efficient engine designs. The companion experiments were conducted using representative single- and multi-cylinder automotive and truck diesel engines.« less
  • Partial Contents: Efficient Search Algorithms for Route Information Services of Direct and Connecting Transit Trips; Influence of Urban Network Features on Quality of Traffic Service; Advanced Traffic Management System: Real-Time Network Traffic Simulation Methodology with a Massively Parallel Computing Architecture; Standards for Intelligent Vehicle-Highway System Technologies; Concept of Super Smart Vehicle Systems and Their Relation to Advanced Vehicle Control Systems; Intelligent Vehicle-Highway System Safety: A Demonstration Specification and Hazard Analysis; California INRAD Project: Demonstration of Low-Power Inductive Loop Radio Technology for Use in Traffic Operations; Development of Prototype Knowledge-Based Expert System for Managing Congestion on Massachusetts Turnpike; Artificial Intelligence-Based Systemmore » Representation and Search Procedures for Transit Route Network Design; Evaluation of Artificial Neural Network Applications in Transportation Engineering; Validation of an Expert System: A Case Study; Model for Optimum Deployment of Emergency Repair Trucks: Application in Electric Utility Industry.« less
  • This report summarizes the major research investigations conducted by the Western Research Institute over the period April 1983 through September 1986. The studies were undertaken as part of the research within the Department of Energy's programs in oil shale, tar sand, underground coal gasification, and advanced process technology. Investigations were conducted to determine the physical and chemical properties of materials suitable for conversion to liquid and gaseous fuels, to evaluate processes for such conversion, to test and evaluate innovative concepts for conversion, to determine potential environmental impacts related to development of commercial-sized operations, and to evaluate methods for mitigation ofmore » potential environmental impacts. The report is divided into two volumes. Volume 1 consists of 70 articles that summarize the findings of the major research efforts that were undertaken. More detailed information can be found in the related publications listed at the end of the individual articles. References for each section, e.g., oil shale, are located at the end of each section. Volume 2 is a listing of publications, presentations, and other professional activities that have resulted from the work conducted under this Cooperative Agreement. Selected papers in this volume have been processed for inclusion in the Energy Data Base.« less