skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: CH Packaging Operations for High Wattage Waste at LANL

Abstract

This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure also provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal.

Authors:
Publication Date:
Research Org.:
Waste Isolation Pilot Plant, Carlsbad, NM (US)
Sponsoring Org.:
US Department of Energy (US)
OSTI Identifier:
815197
Report Number(s):
DOE/WIPP 02-3220, rev. 4
TRN: US0305232
DOE Contract Number:  
04-01AL66444
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 28 Aug 2003
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; GASKETS; HELIUM; LANL; PACKAGING; MANUALS; CONTAINERS; ALPHA-BEARING WASTES; SEALS; LEAK TESTING; DOE; CBFO; TRU; HIGH WATTAGE; TDOP; SWB; PAYLOAD ASSEMBLY; WASTE; DISPOSAL; OCV; ICV; TRUPACT-II; O-RING; SEAL

Citation Formats

Washington TRU Solutions LLC. CH Packaging Operations for High Wattage Waste at LANL. United States: N. p., 2003. Web. doi:10.2172/815197.
Washington TRU Solutions LLC. CH Packaging Operations for High Wattage Waste at LANL. United States. doi:10.2172/815197.
Washington TRU Solutions LLC. Thu . "CH Packaging Operations for High Wattage Waste at LANL". United States. doi:10.2172/815197. https://www.osti.gov/servlets/purl/815197.
@article{osti_815197,
title = {CH Packaging Operations for High Wattage Waste at LANL},
author = {Washington TRU Solutions LLC},
abstractNote = {This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure also provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal.},
doi = {10.2172/815197},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2003},
month = {8}
}