skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Optimization and testing of the Beck Engineering free-piston cryogenic pump for LNG systems on heavy vehicles. Final technical report

Technical Report ·
DOI:https://doi.org/10.2172/809075· OSTI ID:809075

Task 7 was completed by reaching Milestone 7: Test free piston cryogenic pump (FPCP) in Integrated LNG System. Task 4: Alternative Pump Design was also completed. The type of performance of the prototype LNG system is consistent with requirements of fuel systems for heavy vehicles; however, the maximum flow capacity of the prototype LNG system is significantly less than the total flow requirement. The flow capacity of the prototype LNG system is determined by a cavitation limit for the FPCP.

Research Organization:
Beck Engineering, Inc., Gig Harbor, WA (US)
Sponsoring Organization:
USDOE Chicago Operations Office (US)
DOE Contract Number:
AC02-99CH10979
OSTI ID:
809075
Resource Relation:
Other Information: PBD: 10 Jan 2003
Country of Publication:
United States
Language:
English