Title: Project Design Concept Primary Ventilation System

Abstract

Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades tomore » the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements.« less

Authors:
Publication Date:
Research Org.:
NHC (US)
Sponsoring Org.:
USDOE Office of Environmental Management (EM) (US)
OSTI Identifier:
805372
Report Number(s):
RPP-6066, Rev.0
EDT-630776; TRN: US0301297
DOE Contract Number:  
AC27-99RL14047
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 2 Oct 2000
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; DESIGN; RELIABILITY; STORAGE FACILITIES; VENTILATION; VENTILATION SYSTEMS; RADIOACTIVE WASTE STORAGE; MODIFICATIONS

Citation Formats

MCGREW, D.L. Project Design Concept Primary Ventilation System. United States: N. p., 2000. Web. doi:10.2172/805372.
MCGREW, D.L. Project Design Concept Primary Ventilation System. United States. doi:10.2172/805372.
MCGREW, D.L. Mon . "Project Design Concept Primary Ventilation System". United States. doi:10.2172/805372. https://www.osti.gov/servlets/purl/805372.
@article{osti_805372,
title = {Project Design Concept Primary Ventilation System},
author = {MCGREW, D.L.},
abstractNote = {Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements.},
doi = {10.2172/805372},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Oct 02 00:00:00 EDT 2000},
month = {Mon Oct 02 00:00:00 EDT 2000}
}

Technical Report:

Save / Share: