Title: Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program

Abstract

This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms.

Authors:
Publication Date:
Research Org.:
COGEMA (US)
Sponsoring Org.:
USDOE Office of Environmental Management (EM) (US)
OSTI Identifier:
803945
Report Number(s):
RPP-6153, Rev.0
EDT-628307; TRN: US0300741
DOE Contract Number:  
AC27-99RL14047
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 20 Jun 2000
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; DESIGN; MANAGEMENT; PLANNING; STABILIZATION; STORAGE FACILITIES; PERFORMANCE TESTING; PIPES; INSTALLATION; REMEDIAL ACTION

Citation Formats

RUNG, M P. Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program. United States: N. p., 2000. Web. doi:10.2172/803945.
RUNG, M P. Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program. United States. https://doi.org/10.2172/803945
RUNG, M P. 2000. "Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program". United States. https://doi.org/10.2172/803945. https://www.osti.gov/servlets/purl/803945.
@article{osti_803945,
title = {Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program},
author = {RUNG, M P},
abstractNote = {This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms.},
doi = {10.2172/803945},
url = {https://www.osti.gov/biblio/803945}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jun 20 00:00:00 EDT 2000},
month = {Tue Jun 20 00:00:00 EDT 2000}
}