Abstract
The objective of this report period was to continue the development of the Gas Generator design, completion of the hardware and ancillary hardware fabrication and commence the Test Preparations for the testing of the non-polluting unique power turbine driven Gas Generator. Focus during this report period has been on completing the Gas Generator fabrication of hardware and ancillary hardware, and completion of unit closeout brazing and bonding. Because of unacceptable delays encountered in a previously competitively selected test site, CES initiated a re-competition of our testing program and selected an alternate test site. Following that selection, CES used all available resources to make preparations for testing the 10 Mw Gas Generator at the new testing site facilities of NTS at Saugus, CA.
- Authors:
-
- (Gene) Baxter
- Publication Date:
- Research Org.:
- National Energy Technology Lab., Pittsburgh, PA (US); National Energy Technology Lab., Morgantown, WV (US)
- Sponsoring Org.:
- US Department of Energy (US)
- OSTI Identifier:
- 803722
- Report Number(s):
- FC26-00NT40804-05
TRN: US200302%%256
- DOE Contract Number:
- FC26-00NT40804
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 30 Jun 2002
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 20 FOSSIL-FUELED POWER PLANTS; DESIGN; FABRICATION; GAS GENERATORS; PERFORMANCE TESTING; GAS TURBINES; GAS TURBINE POWER PLANTS
Citation Formats
E.W. DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR. United States: N. p., 2002.
Web. doi:10.2172/803722.
E.W. DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR. United States. doi:10.2172/803722.
E.W. Sun .
"DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR". United States.
doi:10.2172/803722. https://www.osti.gov/servlets/purl/803722.
@article{osti_803722,
title = {DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR},
author = {E.W.},
abstractNote = {The objective of this report period was to continue the development of the Gas Generator design, completion of the hardware and ancillary hardware fabrication and commence the Test Preparations for the testing of the non-polluting unique power turbine driven Gas Generator. Focus during this report period has been on completing the Gas Generator fabrication of hardware and ancillary hardware, and completion of unit closeout brazing and bonding. Because of unacceptable delays encountered in a previously competitively selected test site, CES initiated a re-competition of our testing program and selected an alternate test site. Following that selection, CES used all available resources to make preparations for testing the 10 Mw Gas Generator at the new testing site facilities of NTS at Saugus, CA.},
doi = {10.2172/803722},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Jun 30 00:00:00 EDT 2002},
month = {Sun Jun 30 00:00:00 EDT 2002}
}
-
The objective of this report period was to continue the development of the Gas Generator design, fabrication and test of the non-polluting unique power turbine drive Gas Generator. Focus during this past report period has been to continue completion the Gas Generator design, completing the brazing and bonding experiments to determine the best method and materials necessary to fabricate the Gas Generator hardware, continuing to making preparations for fabricating and testing this Gas Generator and commencing with the fabrication of the Gas Generator hardware and ancillary hardware. Designs have been completed sufficiently such that Long Lead Items [LLI] have beenmore »
-
DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR
The objectives of this report period were to complete the development of the Gas Generator design, which was done; fabricate and test of the non-polluting unique power turbine drive gas Gas Generator, which has been postponed. Focus during this report period has been to complete the brazing and bonding necessary to fabricate the Gas Generator hardware, continue making preparations for fabricating and testing the Gas Generator, and continuing the fabrication of the Gas Generator hardware and ancillary hardware in preparation for the test program. Fabrication is more than 95% complete and is expected to conclude in early May 2002. themore » -
DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR
The objectives of this report period were to continue the development of the Gas Generator design, to complete the hardware and ancillary hardware fabrication, and commence the Test Preparations for the testing of the non-polluting unique power turbine drive gas generator. Focus during this report period has been on testing the Gas Generator. Because of unacceptable delays encountered in a previously competitively selected test site, CES initiated a re-competition of our testing program and selected an alternate test site. Following that selection, CES used all available resources to make preparations for testing the 10 Mw Gas Generator at the newmore » -
DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR
The objectives of this report period were to continue and complete testing of the Gas Generator hardware, to complete and submit a Draft Final Report, and after incorporation of adjustments required, to then submit the Final Report. Focus during this report period was initially on testing the Gas Generator. While conducting scheduled full power tests of the Gas Generator at the facilities of the testing sub-contractor, National Testing Services [NTS], in Santa Clarita CA, anomalies in the performance of the Gas Generator were discovered. All testing was stopped on November 6, 2002. An expert team was formed to evaluate themore » -
DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR
The objective of this report period was to continue the development of the Gas Generator design, fabrication and test of the non-polluting unique power turbine drive gas Gas Generator. Focus during this past report period has been to continue completion of the Gas Generator design, preparing brazing and bonding experiments to determine the best method and materials necessary to fabricate the Gas Generator hardware and continuing to making preparations for fabricating and testing this Gas Generator. Various designs have been evaluated and analyzed by various engineering analyst specialists for design characteristics and operating conditions. This design and analyses activity shouldmore »