Title: DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR

Abstract

The objective of this report period was to continue the development of the Gas Generator design, completion of the hardware and ancillary hardware fabrication and commence the Test Preparations for the testing of the non-polluting unique power turbine driven Gas Generator. Focus during this report period has been on completing the Gas Generator fabrication of hardware and ancillary hardware, and completion of unit closeout brazing and bonding. Because of unacceptable delays encountered in a previously competitively selected test site, CES initiated a re-competition of our testing program and selected an alternate test site. Following that selection, CES used all available resources to make preparations for testing the 10 Mw Gas Generator at the new testing site facilities of NTS at Saugus, CA.

Authors:
 [1]
  1. (Gene) Baxter
Publication Date:
Research Org.:
National Energy Technology Lab., Pittsburgh, PA (US); National Energy Technology Lab., Morgantown, WV (US)
Sponsoring Org.:
US Department of Energy (US)
OSTI Identifier:
803722
Report Number(s):
FC26-00NT40804-05
TRN: US200302%%256
DOE Contract Number:
FC26-00NT40804
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 30 Jun 2002
Country of Publication:
United States
Language:
English
Subject:
20 FOSSIL-FUELED POWER PLANTS; DESIGN; FABRICATION; GAS GENERATORS; PERFORMANCE TESTING; GAS TURBINES; GAS TURBINE POWER PLANTS

Citation Formats

E.W. DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR. United States: N. p., 2002. Web. doi:10.2172/803722.
E.W. DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR. United States. doi:10.2172/803722.
E.W. Sun . "DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR". United States. doi:10.2172/803722. https://www.osti.gov/servlets/purl/803722.
@article{osti_803722,
title = {DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR},
author = {E.W.},
abstractNote = {The objective of this report period was to continue the development of the Gas Generator design, completion of the hardware and ancillary hardware fabrication and commence the Test Preparations for the testing of the non-polluting unique power turbine driven Gas Generator. Focus during this report period has been on completing the Gas Generator fabrication of hardware and ancillary hardware, and completion of unit closeout brazing and bonding. Because of unacceptable delays encountered in a previously competitively selected test site, CES initiated a re-competition of our testing program and selected an alternate test site. Following that selection, CES used all available resources to make preparations for testing the 10 Mw Gas Generator at the new testing site facilities of NTS at Saugus, CA.},
doi = {10.2172/803722},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Jun 30 00:00:00 EDT 2002},
month = {Sun Jun 30 00:00:00 EDT 2002}
}

Technical Report:

Save / Share:
  • The objective of this report period was to continue the development of the Gas Generator design, fabrication and test of the non-polluting unique power turbine drive Gas Generator. Focus during this past report period has been to continue completion the Gas Generator design, completing the brazing and bonding experiments to determine the best method and materials necessary to fabricate the Gas Generator hardware, continuing to making preparations for fabricating and testing this Gas Generator and commencing with the fabrication of the Gas Generator hardware and ancillary hardware. Designs have been completed sufficiently such that Long Lead Items [LLI] have beenmore » ordered and upon arrival will be readied for the fabrication process. The keys to this design are the platelet construction of the injectors that precisely measures/meters the flow of the propellants and water all throughout the steam generating process and the CES patented gas generating cycle. The Igniter Assembly injector platelets fabrication process has been completed and bonded to the Igniter Assembly and final machined. The Igniter Assembly is in final assembly and is being readied for testing in the October 2001 time frame. Test Plan dated August 2001, was revised and finalized, replacing Test Plan dated May 2001.« less
  • The objectives of this report period were to complete the development of the Gas Generator design, which was done; fabricate and test of the non-polluting unique power turbine drive gas Gas Generator, which has been postponed. Focus during this report period has been to complete the brazing and bonding necessary to fabricate the Gas Generator hardware, continue making preparations for fabricating and testing the Gas Generator, and continuing the fabrication of the Gas Generator hardware and ancillary hardware in preparation for the test program. Fabrication is more than 95% complete and is expected to conclude in early May 2002. themore » test schedule was affected by relocation of the testing to another test supplier. The target test date for hot fire testing is now not earlier than June 15, 2002.« less
  • The objectives of this report period were to continue the development of the Gas Generator design, to complete the hardware and ancillary hardware fabrication, and commence the Test Preparations for the testing of the non-polluting unique power turbine drive gas generator. Focus during this report period has been on testing the Gas Generator. Because of unacceptable delays encountered in a previously competitively selected test site, CES initiated a re-competition of our testing program and selected an alternate test site. Following that selection, CES used all available resources to make preparations for testing the 10 Mw Gas Generator at the newmore » testing site facilities of NTS at Saugus, CA. A substantial portion of this report period was devoted to Testing Preparations, i.e. test facility development, cold- flow testing, calibration testing, performing igniter ignition testing, and then commencement of the completely assembled Gas Generator Assembly Testing, in process at this writing.« less
  • The objectives of this report period were to continue and complete testing of the Gas Generator hardware, to complete and submit a Draft Final Report, and after incorporation of adjustments required, to then submit the Final Report. Focus during this report period was initially on testing the Gas Generator. While conducting scheduled full power tests of the Gas Generator at the facilities of the testing sub-contractor, National Testing Services [NTS], in Santa Clarita CA, anomalies in the performance of the Gas Generator were discovered. All testing was stopped on November 6, 2002. An expert team was formed to evaluate themore » anomalies and to recommend any appropriate corrective actions. After extensive analyses of the actual hardware, the test data acquired and recorded during testing, and a review of the test facilities and procedures, the Anomalies Review Team recommended that CES modify the combustion chamber front end cooling method and modify the configuration of the diluent injectors downstream of the combustion chamber, to eliminate the anomalies. At a review meeting convened in Sacramento CA on November 23, 2002, outside experts from the Lawrence Livermore National Laboratory, Air Liquide's Research Center in Chicago IL, and the California Energy Commission, confirmed that the expert team's assessed cause of the problem was the likely cause, and the recommended corrective actions were appropriate. Modified hardware drawings were produced in late November-early December 2002, hardware fabrication was begun in December, and was in process at the end of December. Also during December, the NTS test facility was being adjusted to take account of the modified hardware configuration being produced. All work was aimed toward realizing a schedule of resumed testing by mid-January for completion of tests by end of January or early February, 2003. Original objectives of the program remain in place and approximately ninety (90) percent of those objectives had been completed prior to discovery of the anomalies. The accomplished objectives to date are described in this report.« less
  • The objective of this report period was to continue the development of the Gas Generator design, fabrication and test of the non-polluting unique power turbine drive gas Gas Generator. Focus during this past report period has been to continue completion of the Gas Generator design, preparing brazing and bonding experiments to determine the best method and materials necessary to fabricate the Gas Generator hardware and continuing to making preparations for fabricating and testing this Gas Generator. Various designs have been evaluated and analyzed by various engineering analyst specialists for design characteristics and operating conditions. This design and analyses activity shouldmore » be concluding in July 2001, with the hardware design drawings being released for Long lead Item (LLI) procurement and commencement of the fabrication process. Designs have been completed sufficiently such that LLI have been ordered and upon arrival will be readied for the fabrication process. The keys to this design are the platelet construction of the injectors that precisely measures/meters the flow of the propellants and water all throughout the steam generating process and the CES patented gas generating cycle. The igniter injector platelets have begun the fabrication process because that material is already available for processing.« less