Title: Engineering Task Plan for Hepa Filter Differential Pressure (DP) Fan Interlock Upgrades

Abstract

This document provides a plan for installation of Differential Pressure (DP) fan interlocks on the primary ventilation systems in selected Tank Farm facilities. This plan contains the engineering tasks required for installation and is summarized by the Acceptance for Beneficial Use list. Individuals responsible for each task are identified and scheduled accordingly.

Authors:
Publication Date:
Research Org.:
COGEMA (US)
Sponsoring Org.:
ENVIRONMENTAL MANAGEMENT (US)
OSTI Identifier:
803664
Report Number(s):
RPP-6180, Rev.0
EDT-626598; TRN: US0301604
DOE Contract Number:  
AC27-99RL14047
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 19 May 2000
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; BLOWERS; INTERLOCKS; STORAGE FACILITIES; VENTILATION SYSTEMS; AIR FILTERS; INSTALLATION; RADIOACTIVE WASTE STORAGE; EXHAUST SYSTEMS

Citation Formats

SIMONS, S.R. Engineering Task Plan for Hepa Filter Differential Pressure (DP) Fan Interlock Upgrades. United States: N. p., 2000. Web. doi:10.2172/803664.
SIMONS, S.R. Engineering Task Plan for Hepa Filter Differential Pressure (DP) Fan Interlock Upgrades. United States. doi:10.2172/803664.
SIMONS, S.R. Fri . "Engineering Task Plan for Hepa Filter Differential Pressure (DP) Fan Interlock Upgrades". United States. doi:10.2172/803664. https://www.osti.gov/servlets/purl/803664.
@article{osti_803664,
title = {Engineering Task Plan for Hepa Filter Differential Pressure (DP) Fan Interlock Upgrades},
author = {SIMONS, S.R.},
abstractNote = {This document provides a plan for installation of Differential Pressure (DP) fan interlocks on the primary ventilation systems in selected Tank Farm facilities. This plan contains the engineering tasks required for installation and is summarized by the Acceptance for Beneficial Use list. Individuals responsible for each task are identified and scheduled accordingly.},
doi = {10.2172/803664},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2000},
month = {5}
}