Title: 244-AR Vault Interim Stabilization Project Plan

Abstract

The 244-AR Vault Facility, constructed between 1966 and 1968, was designed to provide lag storage and treatment for the Plutonium-Uranium Extraction Facility (PUREX) tank farm sludges. Tank farm personnel transferred the waste from the 244-AR Vault Facility to B Plant for recovery of cesium and strontium. B Plant personnel then transferred the treatment residuals back to the tank farms for storage of the sludge and liquids. The last process operations, which transferred waste supporting the cesium/strontium recovery mission, occurred in April 1978. After the final transfer in 1978, the 244-AR facility underwent a cleanout. However, 2,271 L (600 gal) of sludge were left in Tank 004AR from an earlier transfer from Tank 241-AX-104. When the cleanout was completed, the facility was placed in a standby status. The sludge had been transferred to Tank 004AR to support Pacific Northwest National Laboratory [PNNL] vitrification work. Documentation of waste transfers suggests that a portion of the sludge may have been moved from Tank 004AR to Tank 002AR in preparation for transfer back to the AX Tank Farm; however, quantities of the sludge that were moved to Tank 002AR from that transfer must be estimated.

Authors:
Publication Date:
Research Org.:
CHG (US)
Sponsoring Org.:
ENVIRONMENTAL MANAGEMENT (US)
OSTI Identifier:
801868
Report Number(s):
RPP-5635, Rev.0
EDT-628386; TRN: US0300305
DOE Contract Number:  
AC27-99RL14047
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 24 Mar 2000
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; CESIUM; DOCUMENTATION; PERSONNEL; SLUDGES; STABILIZATION; STORAGE; STORAGE FACILITIES; STRONTIUM; TANKS; VITRIFICATION; WASTES

Citation Formats

LANEY, T. 244-AR Vault Interim Stabilization Project Plan. United States: N. p., 2000. Web. doi:10.2172/801868.
LANEY, T. 244-AR Vault Interim Stabilization Project Plan. United States. doi:10.2172/801868.
LANEY, T. Fri . "244-AR Vault Interim Stabilization Project Plan". United States. doi:10.2172/801868. https://www.osti.gov/servlets/purl/801868.
@article{osti_801868,
title = {244-AR Vault Interim Stabilization Project Plan},
author = {LANEY, T.},
abstractNote = {The 244-AR Vault Facility, constructed between 1966 and 1968, was designed to provide lag storage and treatment for the Plutonium-Uranium Extraction Facility (PUREX) tank farm sludges. Tank farm personnel transferred the waste from the 244-AR Vault Facility to B Plant for recovery of cesium and strontium. B Plant personnel then transferred the treatment residuals back to the tank farms for storage of the sludge and liquids. The last process operations, which transferred waste supporting the cesium/strontium recovery mission, occurred in April 1978. After the final transfer in 1978, the 244-AR facility underwent a cleanout. However, 2,271 L (600 gal) of sludge were left in Tank 004AR from an earlier transfer from Tank 241-AX-104. When the cleanout was completed, the facility was placed in a standby status. The sludge had been transferred to Tank 004AR to support Pacific Northwest National Laboratory [PNNL] vitrification work. Documentation of waste transfers suggests that a portion of the sludge may have been moved from Tank 004AR to Tank 002AR in preparation for transfer back to the AX Tank Farm; however, quantities of the sludge that were moved to Tank 002AR from that transfer must be estimated.},
doi = {10.2172/801868},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Mar 24 00:00:00 EST 2000},
month = {Fri Mar 24 00:00:00 EST 2000}
}