skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000

Abstract

This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.

Authors:
Publication Date:
Research Org.:
CHG (US)
Sponsoring Org.:
ENVIRONMENTAL MANAGEMENT (US)
OSTI Identifier:
801143
Report Number(s):
RPP-5583, Rev.0
EDT-628085; TRN: US0300102
DOE Contract Number:  
AC27-99RL14047
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 10 Jan 2000
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; STORAGE FACILITIES; ULTRASONIC TESTING; DEFECTS; PERFORMANCE TESTING; RADIOACTIVE WASTE STORAGE; HANFORD RESERVATION

Citation Formats

JENSEN, C.E. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000. United States: N. p., 2000. Web. doi:10.2172/801143.
JENSEN, C.E. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000. United States. doi:10.2172/801143.
JENSEN, C.E. Mon . "Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000". United States. doi:10.2172/801143. https://www.osti.gov/servlets/purl/801143.
@article{osti_801143,
title = {Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000},
author = {JENSEN, C.E.},
abstractNote = {This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.},
doi = {10.2172/801143},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2000},
month = {1}
}