skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: RHIC BPM SYSTEM PERFORMANCE, UPGRADES, AND TOOLS.

Abstract

During the RHIC 2001-2 run, the beam position monitor (BPM) system provided independent average orbit and turn-by-turn (TBT) position measurements at 162 locations in each measurement plane and RHIC ring. TBT acquisition was successfully upgraded from 128 turns to 1024 turns per trigger, including injection. Closed orbits were acquired and automatically archived every two seconds through each acceleration ramp for orbit analysis and feed-forward orbit correction. This paper presents the overall system performance during this run, including precision, reproducibility, radiation damage, and analysis tools. We also summarize future plans, including million-turn TBT acquisition for nonlinear dynamics studies.

Authors:
; ; ; ; ; ; ; ;
Publication Date:
Research Org.:
Brookhaven National Lab. (BNL), Upton, NY (United States)
Sponsoring Org.:
USDOE Office of Energy Research (ER) (US)
OSTI Identifier:
798551
Report Number(s):
BNL-68941
R&D Project: AD003; KA0202011; TRN: US0204840
DOE Contract Number:  
AC02-98CH10886
Resource Type:
Conference
Resource Relation:
Conference: 2002 EUROPEAN PARTICLE ACCELERATOR CONFERENCE, PARIS (FR), 06/02/2002--06/07/2002; Other Information: PBD: 2 Jun 2002
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS; ACCELERATORS; PERFORMANCE; BROOKHAVEN RHIC

Citation Formats

SATOGATA, T, CAMERON, P, CERNIGLIA, P, CUPOLO, J, DAWSON, C, DEGEN, C, MEAD, J, PTITSYN, V, and SIKORA, R. RHIC BPM SYSTEM PERFORMANCE, UPGRADES, AND TOOLS.. United States: N. p., 2002. Web.
SATOGATA, T, CAMERON, P, CERNIGLIA, P, CUPOLO, J, DAWSON, C, DEGEN, C, MEAD, J, PTITSYN, V, & SIKORA, R. RHIC BPM SYSTEM PERFORMANCE, UPGRADES, AND TOOLS.. United States.
SATOGATA, T, CAMERON, P, CERNIGLIA, P, CUPOLO, J, DAWSON, C, DEGEN, C, MEAD, J, PTITSYN, V, and SIKORA, R. 2002. "RHIC BPM SYSTEM PERFORMANCE, UPGRADES, AND TOOLS.". United States. https://www.osti.gov/servlets/purl/798551.
@article{osti_798551,
title = {RHIC BPM SYSTEM PERFORMANCE, UPGRADES, AND TOOLS.},
author = {SATOGATA, T and CAMERON, P and CERNIGLIA, P and CUPOLO, J and DAWSON, C and DEGEN, C and MEAD, J and PTITSYN, V and SIKORA, R},
abstractNote = {During the RHIC 2001-2 run, the beam position monitor (BPM) system provided independent average orbit and turn-by-turn (TBT) position measurements at 162 locations in each measurement plane and RHIC ring. TBT acquisition was successfully upgraded from 128 turns to 1024 turns per trigger, including injection. Closed orbits were acquired and automatically archived every two seconds through each acceleration ramp for orbit analysis and feed-forward orbit correction. This paper presents the overall system performance during this run, including precision, reproducibility, radiation damage, and analysis tools. We also summarize future plans, including million-turn TBT acquisition for nonlinear dynamics studies.},
doi = {},
url = {https://www.osti.gov/biblio/798551}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Jun 02 00:00:00 EDT 2002},
month = {Sun Jun 02 00:00:00 EDT 2002}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: