RHIC BPM SYSTEM PERFORMANCE, UPGRADES, AND TOOLS.
Abstract
During the RHIC 2001-2 run, the beam position monitor (BPM) system provided independent average orbit and turn-by-turn (TBT) position measurements at 162 locations in each measurement plane and RHIC ring. TBT acquisition was successfully upgraded from 128 turns to 1024 turns per trigger, including injection. Closed orbits were acquired and automatically archived every two seconds through each acceleration ramp for orbit analysis and feed-forward orbit correction. This paper presents the overall system performance during this run, including precision, reproducibility, radiation damage, and analysis tools. We also summarize future plans, including million-turn TBT acquisition for nonlinear dynamics studies.
- Authors:
- Publication Date:
- Research Org.:
- Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Org.:
- USDOE Office of Energy Research (ER) (US)
- OSTI Identifier:
- 798551
- Report Number(s):
- BNL-68941
R&D Project: AD003; KA0202011; TRN: US0204840
- DOE Contract Number:
- AC02-98CH10886
- Resource Type:
- Conference
- Resource Relation:
- Conference: 2002 EUROPEAN PARTICLE ACCELERATOR CONFERENCE, PARIS (FR), 06/02/2002--06/07/2002; Other Information: PBD: 2 Jun 2002
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 43 PARTICLE ACCELERATORS; ACCELERATORS; PERFORMANCE; BROOKHAVEN RHIC
Citation Formats
SATOGATA, T, CAMERON, P, CERNIGLIA, P, CUPOLO, J, DAWSON, C, DEGEN, C, MEAD, J, PTITSYN, V, and SIKORA, R. RHIC BPM SYSTEM PERFORMANCE, UPGRADES, AND TOOLS.. United States: N. p., 2002.
Web.
SATOGATA, T, CAMERON, P, CERNIGLIA, P, CUPOLO, J, DAWSON, C, DEGEN, C, MEAD, J, PTITSYN, V, & SIKORA, R. RHIC BPM SYSTEM PERFORMANCE, UPGRADES, AND TOOLS.. United States.
SATOGATA, T, CAMERON, P, CERNIGLIA, P, CUPOLO, J, DAWSON, C, DEGEN, C, MEAD, J, PTITSYN, V, and SIKORA, R. 2002.
"RHIC BPM SYSTEM PERFORMANCE, UPGRADES, AND TOOLS.". United States. https://www.osti.gov/servlets/purl/798551.
@article{osti_798551,
title = {RHIC BPM SYSTEM PERFORMANCE, UPGRADES, AND TOOLS.},
author = {SATOGATA, T and CAMERON, P and CERNIGLIA, P and CUPOLO, J and DAWSON, C and DEGEN, C and MEAD, J and PTITSYN, V and SIKORA, R},
abstractNote = {During the RHIC 2001-2 run, the beam position monitor (BPM) system provided independent average orbit and turn-by-turn (TBT) position measurements at 162 locations in each measurement plane and RHIC ring. TBT acquisition was successfully upgraded from 128 turns to 1024 turns per trigger, including injection. Closed orbits were acquired and automatically archived every two seconds through each acceleration ramp for orbit analysis and feed-forward orbit correction. This paper presents the overall system performance during this run, including precision, reproducibility, radiation damage, and analysis tools. We also summarize future plans, including million-turn TBT acquisition for nonlinear dynamics studies.},
doi = {},
url = {https://www.osti.gov/biblio/798551},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Jun 02 00:00:00 EDT 2002},
month = {Sun Jun 02 00:00:00 EDT 2002}
}
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.