skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Alternatives generation and analysis for double-shell tank primary ventilation systems emissions control and monitoring

Abstract

This AGA addresses the question: ''What equipment upgrades, operational changes, and/or other actions are required relative to the DST tanks farms' ventilation systems to support retrieval, staging (including feed sampling), and delivery of tank waste to the Phase I private contractor?'' Issues and options for the various components within the ventilation subsystem affect each other. Recommended design requirements are presented and the preferred alternatives are detailed.

Authors:
Publication Date:
Research Org.:
ARES (US)
Sponsoring Org.:
ENVIRONMENTAL MANAGEMENT (US)
OSTI Identifier:
798017
Report Number(s):
HNF-4245, Rev.0
TRN: US0205994
DOE Contract Number:
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 30 Sep 1999
Country of Publication:
United States
Language:
English
Subject:
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; 12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; AIR POLLUTION MONITORING; SAMPLING; VENTILATION SYSTEMS; STORAGE FACILITIES; AIR POLLUTION CONTROL; WASTE RETRIEVAL; DESIGN; RADIOACTIVE WASTE STORAGE

Citation Formats

SEDERBURG, J.P. Alternatives generation and analysis for double-shell tank primary ventilation systems emissions control and monitoring. United States: N. p., 1999. Web. doi:10.2172/798017.
SEDERBURG, J.P. Alternatives generation and analysis for double-shell tank primary ventilation systems emissions control and monitoring. United States. doi:10.2172/798017.
SEDERBURG, J.P. Thu . "Alternatives generation and analysis for double-shell tank primary ventilation systems emissions control and monitoring". United States. doi:10.2172/798017. https://www.osti.gov/servlets/purl/798017.
@article{osti_798017,
title = {Alternatives generation and analysis for double-shell tank primary ventilation systems emissions control and monitoring},
author = {SEDERBURG, J.P.},
abstractNote = {This AGA addresses the question: ''What equipment upgrades, operational changes, and/or other actions are required relative to the DST tanks farms' ventilation systems to support retrieval, staging (including feed sampling), and delivery of tank waste to the Phase I private contractor?'' Issues and options for the various components within the ventilation subsystem affect each other. Recommended design requirements are presented and the preferred alternatives are detailed.},
doi = {10.2172/798017},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Sep 30 00:00:00 EDT 1999},
month = {Thu Sep 30 00:00:00 EDT 1999}
}

Technical Report:

Save / Share: