skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Project Plan Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project

Abstract

This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove SNM Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev.0. This project plan is the top-level definitive project management document for the PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baseline to manage the execution of the Remove SNM Materials project. Any deviation to the document must be authorized through the appropriate change control process. The Remove SNM Materials project provides the necessary support and controls required for DOE-HQ, DOE-RL, BWHC, and other DOE Complex Contractors the path forward to negotiate shipped/receiver agreements, schedule shipments, and transfer material out of PFP to enable final deactivation.

Authors:
Publication Date:
Research Org.:
BWHC (US)
Sponsoring Org.:
ENVIRONMENTAL MANAGEMENT (US)
OSTI Identifier:
798006
Report Number(s):
HNF-3752, Rev.1
TRN: US0205360
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 14 Sep 1999
Country of Publication:
United States
Language:
English
Subject:
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; PLANNING; PLUTONIUM; PROGRAM MANAGEMENT; STABILIZATION; FUEL REPROCESSING PLANTS; MATERIALS RECOVERY; RADIOACTIVE MATERIALS

Citation Formats

BARTLETT, W.D. Project Plan Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project. United States: N. p., 1999. Web. doi:10.2172/798006.
BARTLETT, W.D. Project Plan Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project. United States. doi:10.2172/798006.
BARTLETT, W.D. Tue . "Project Plan Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project". United States. doi:10.2172/798006. https://www.osti.gov/servlets/purl/798006.
@article{osti_798006,
title = {Project Plan Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project},
author = {BARTLETT, W.D.},
abstractNote = {This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove SNM Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev.0. This project plan is the top-level definitive project management document for the PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baseline to manage the execution of the Remove SNM Materials project. Any deviation to the document must be authorized through the appropriate change control process. The Remove SNM Materials project provides the necessary support and controls required for DOE-HQ, DOE-RL, BWHC, and other DOE Complex Contractors the path forward to negotiate shipped/receiver agreements, schedule shipments, and transfer material out of PFP to enable final deactivation.},
doi = {10.2172/798006},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1999},
month = {9}
}