Title: Drawing Evaluation Report for Sampling Equipment

Abstract

This document presents the results of a task to update the evaluation of River Protection Project (WP) sampling equipment drawings and updates the assigned drawings category as either essential, support, or general drawings. This report updates the drawing evaluation that was originally done per Engineering Task Plan For Truck 3 & 4 Drawing Compliance and Evaluation. The scope of this report is limited to updating the evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the RPP Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, all core sampling equipment, and Light Duty Utility Arm (LDUA) (see LMHC contract No. 519, release 10). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The Cone Penetrometer system, which is depicted on vendor drawings, (not H- series), is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and was not included in the original scope for this update and will be addressed in the evaluation update scheduled for later in fiscal year 1999,more » when equipment ownership is determined.« less

Authors:
Publication Date:
Research Org.:
COGEMA (US)
Sponsoring Org.:
ENVIRONMENTAL MANAGEMENT (US)
OSTI Identifier:
797995
Report Number(s):
HNF-2305, Rev.1
ECN-653981; TRN: US0205353
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 9 Sep 1999
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; EVALUATION; SAMPLING; STORAGE FACILITIES; SAMPLERS; ENGINEERING DRAWINGS; REMOTE HANDLING EQUIPMENT

Citation Formats

BOGER, R.M. Drawing Evaluation Report for Sampling Equipment. United States: N. p., 1999. Web. doi:10.2172/797995.
BOGER, R.M. Drawing Evaluation Report for Sampling Equipment. United States. doi:10.2172/797995.
BOGER, R.M. Thu . "Drawing Evaluation Report for Sampling Equipment". United States. doi:10.2172/797995. https://www.osti.gov/servlets/purl/797995.
@article{osti_797995,
title = {Drawing Evaluation Report for Sampling Equipment},
author = {BOGER, R.M.},
abstractNote = {This document presents the results of a task to update the evaluation of River Protection Project (WP) sampling equipment drawings and updates the assigned drawings category as either essential, support, or general drawings. This report updates the drawing evaluation that was originally done per Engineering Task Plan For Truck 3 & 4 Drawing Compliance and Evaluation. The scope of this report is limited to updating the evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the RPP Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, all core sampling equipment, and Light Duty Utility Arm (LDUA) (see LMHC contract No. 519, release 10). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The Cone Penetrometer system, which is depicted on vendor drawings, (not H- series), is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and was not included in the original scope for this update and will be addressed in the evaluation update scheduled for later in fiscal year 1999, when equipment ownership is determined.},