Title: River Protection Project Integrated safety management system phase II verification report, volumes I and II - 8/19/99

Abstract

The Department of Energy policy (DOE P 450.4) is that safety is integrated into all aspects of the management and operations of its facilities. In simple and straightforward terms, the Department will ''Do work safely.'' The purpose of this River Protection Project (RPP) Integrated Safety Management System (ISMS) Phase II Verification was to determine whether ISMS programs and processes are implemented within RFP to accomplish the goal of ''Do work safely.'' The goal of an implemented ISMS is to have a single integrated system that includes Environment, Safety, and Health (ES&H) requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and federal property over the RPP life cycle. The ISMS is comprised of the (1) described functions, components, processes, and interfaces (system map or blueprint) and (2) personnel who are executing those assigned roles and responsibilities to manage and control the ISMS. Therefore, this review evaluated both the ''paper'' and ''people'' aspects of the ISMS to ensure that the system is implemented within RPP. Richland Operations Office (RL) conducted an ISMS Phase I Verification of the TWRS from September 28-October 9, 1998. The resulting verification report recommended that TWRS-RL and the contractormore » proceed with Phase II of ISMS verification given that the concerns identified from the Phase I verification review are incorporated into the Phase II implementation plan.« less

Authors:
Publication Date:
Research Org.:
DOE-RL (US)
Sponsoring Org.:
ENVIRONMENTAL MANAGEMENT (US)
OSTI Identifier:
797991
Report Number(s):
DOE/RL-99-56, Rev.0
TRN: US200222%%356
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 10 Sep 1999
Country of Publication:
United States
Language:
English
Subject:
29 ENERGY PLANNING, POLICY AND ECONOMY; CONTRACTORS; ENERGY POLICY; IMPLEMENTATION; LIFE CYCLE; MANAGEMENT; PERSONNEL; PLANNING; RIVERS; SAFETY; VERIFICATION

Citation Formats

SHOOP, D.S. River Protection Project Integrated safety management system phase II verification report, volumes I and II - 8/19/99. United States: N. p., 1999. Web. doi:10.2172/797991.
SHOOP, D.S. River Protection Project Integrated safety management system phase II verification report, volumes I and II - 8/19/99. United States. doi:10.2172/797991.
SHOOP, D.S. Fri . "River Protection Project Integrated safety management system phase II verification report, volumes I and II - 8/19/99". United States. doi:10.2172/797991. https://www.osti.gov/servlets/purl/797991.
@article{osti_797991,
title = {River Protection Project Integrated safety management system phase II verification report, volumes I and II - 8/19/99},
author = {SHOOP, D.S.},
abstractNote = {The Department of Energy policy (DOE P 450.4) is that safety is integrated into all aspects of the management and operations of its facilities. In simple and straightforward terms, the Department will ''Do work safely.'' The purpose of this River Protection Project (RPP) Integrated Safety Management System (ISMS) Phase II Verification was to determine whether ISMS programs and processes are implemented within RFP to accomplish the goal of ''Do work safely.'' The goal of an implemented ISMS is to have a single integrated system that includes Environment, Safety, and Health (ES&H) requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and federal property over the RPP life cycle. The ISMS is comprised of the (1) described functions, components, processes, and interfaces (system map or blueprint) and (2) personnel who are executing those assigned roles and responsibilities to manage and control the ISMS. Therefore, this review evaluated both the ''paper'' and ''people'' aspects of the ISMS to ensure that the system is implemented within RPP. Richland Operations Office (RL) conducted an ISMS Phase I Verification of the TWRS from September 28-October 9, 1998. The resulting verification report recommended that TWRS-RL and the contractor proceed with Phase II of ISMS verification given that the concerns identified from the Phase I verification review are incorporated into the Phase II implementation plan.},
doi = {10.2172/797991},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1999},
month = {9}
}