Title: Set point calculations for RAPID project

Abstract

The Respond and Pump in Days (RAPID) project was initiated to pump part of the contents of tank 241-SY-101 into tank 241-SY-102. This document establishes the basis for all set points and ranges used in the RAPID project. There are 23 instrument and/or control loops utilized by the RAPID project. These range from the simple indication loop with two components to complex indication, control, and alarm loops with up to eight components. Several loops include safety class elements. This document is intended to describe the loops in full and to provide the basis for each of the element setpoints, ranges and accuracies identified in the RAPID project Master Equipment List (MEL). These values are developed in two steps. First, the base value is identified with reference to the supporting document providing that value. Second, a spreadsheet calculation is performed on each element and loop, utilizing a standard methodology described below, that takes into account known and suspected variance in output and establishes the actual setpoint used on a given element. The results of the spreadsheet are reported directly in this document.

Authors:
Publication Date:
Research Org.:
FDNW (US)
Sponsoring Org.:
ENVIRONMENTAL MANAGEMENT (US)
OSTI Identifier:
797746
Report Number(s):
HNF-4972, Rev.0
TRN: US0204984
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 27 Aug 1999
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; SAFETY ENGINEERING; STORAGE FACILITIES; PUMPING; WASTE RETRIEVAL; EMERGENCY PLANS; MEASURING INSTRUMENTS; MONITORS; LIMITING VALUES

Citation Formats

HICKMAN, G.L. Set point calculations for RAPID project. United States: N. p., 1999. Web. doi:10.2172/797746.
HICKMAN, G.L. Set point calculations for RAPID project. United States. doi:10.2172/797746.
HICKMAN, G.L. Fri . "Set point calculations for RAPID project". United States. doi:10.2172/797746. https://www.osti.gov/servlets/purl/797746.
@article{osti_797746,
title = {Set point calculations for RAPID project},
author = {HICKMAN, G.L.},
abstractNote = {The Respond and Pump in Days (RAPID) project was initiated to pump part of the contents of tank 241-SY-101 into tank 241-SY-102. This document establishes the basis for all set points and ranges used in the RAPID project. There are 23 instrument and/or control loops utilized by the RAPID project. These range from the simple indication loop with two components to complex indication, control, and alarm loops with up to eight components. Several loops include safety class elements. This document is intended to describe the loops in full and to provide the basis for each of the element setpoints, ranges and accuracies identified in the RAPID project Master Equipment List (MEL). These values are developed in two steps. First, the base value is identified with reference to the supporting document providing that value. Second, a spreadsheet calculation is performed on each element and loop, utilizing a standard methodology described below, that takes into account known and suspected variance in output and establishes the actual setpoint used on a given element. The results of the spreadsheet are reported directly in this document.},
doi = {10.2172/797746},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1999},
month = {8}
}