Title: Operation and maintenance manual for septic holding tank system for project W-519, two double-wide construction support trailers

Abstract

This manual was prepared to provide detailed information for the operation and maintenance of the sanitary wastewater holding system. This procedure sets forth system operations which include type and frequency of required maintenance as well as system failure response procedures. The system consists of a sanitary sewage holding tank, two alarms and appurtenances necessary to provide a functional system. The maximum daily design flow is 696 liters. The holding tank is located as shown on the site plan.

Authors:
Publication Date:
Research Org.:
FDNW (US)
Sponsoring Org.:
ENVIRONMENTAL MANAGEMENT (US)
OSTI Identifier:
797734
Report Number(s):
HNF-4813, Rev.0
TRN: US0204925
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 25 Aug 1999
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; CONSTRUCTION; DESIGN; MAINTENANCE; SEWAGE; TANKS; MANUALS; OPERATION; WASTE WATER

Citation Formats

MORTIMER, C.S. Operation and maintenance manual for septic holding tank system for project W-519, two double-wide construction support trailers. United States: N. p., 1999. Web. doi:10.2172/797734.
MORTIMER, C.S. Operation and maintenance manual for septic holding tank system for project W-519, two double-wide construction support trailers. United States. doi:10.2172/797734.
MORTIMER, C.S. Wed . "Operation and maintenance manual for septic holding tank system for project W-519, two double-wide construction support trailers". United States. doi:10.2172/797734. https://www.osti.gov/servlets/purl/797734.
@article{osti_797734,
title = {Operation and maintenance manual for septic holding tank system for project W-519, two double-wide construction support trailers},
author = {MORTIMER, C.S.},
abstractNote = {This manual was prepared to provide detailed information for the operation and maintenance of the sanitary wastewater holding system. This procedure sets forth system operations which include type and frequency of required maintenance as well as system failure response procedures. The system consists of a sanitary sewage holding tank, two alarms and appurtenances necessary to provide a functional system. The maximum daily design flow is 696 liters. The holding tank is located as shown on the site plan.},
doi = {10.2172/797734},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1999},
month = {8}
}