skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

Abstract

This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems.

Authors:
Publication Date:
Research Org.:
NHC (US)
Sponsoring Org.:
ENVIRONMENTAL MANAGEMENT (US)
OSTI Identifier:
797672
Report Number(s):
HNF-4072, Rev.0
TRN: US0204895
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 25 Aug 1999
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; 99 GENERAL AND MISCELLANEOUS//MATHEMATICS, COMPUTING, AND INFORMATION SCIENCE; COMPLIANCE; DESIGN; AIR POLLUTION MONITORING; VENTILATION SYSTEMS; RADIOACTIVE WASTE FACILITIES; COMPUTERIZED CONTROL SYSTEMS; AIR POLLUTION MONITORS; VERIFICATION

Citation Formats

BUSSELL, J.H. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan. United States: N. p., 1999. Web. doi:10.2172/797672.
BUSSELL, J.H. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan. United States. doi:10.2172/797672.
BUSSELL, J.H. Wed . "Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan". United States. doi:10.2172/797672. https://www.osti.gov/servlets/purl/797672.
@article{osti_797672,
title = {Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan},
author = {BUSSELL, J.H.},
abstractNote = {This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems.},
doi = {10.2172/797672},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Aug 25 00:00:00 EDT 1999},
month = {Wed Aug 25 00:00:00 EDT 1999}
}

Technical Report:

Save / Share: