Title: Master equipment list 500 CFM portable exhauster POR-005 skid C

Abstract

The Master Equipment List (MEL) lists all the major components of the 500 cfm exhauster PORO5. The purpose of this Master Equipment List is to provide basic information and references to other documents for the listed components.

Authors:
Publication Date:
Research Org.:
LMHC (US)
Sponsoring Org.:
ENVIRONMENTAL MANAGEMENT (US)
OSTI Identifier:
797499
Report Number(s):
HNF-4623, Rev.0
TRN: US0201932
DOE Contract Number:
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 8 Jul 1999
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; EXHAUST SYSTEMS; STORAGE FACILITIES; RADIOACTIVE WASTE STORAGE; DESIGN; PORTABLE EQUIPMENT; 500 CFM EXHAUSTER; MASTER EQUIPMENT LIST

Citation Formats

KRISKOVICH, J.R. Master equipment list 500 CFM portable exhauster POR-005 skid C. United States: N. p., 1999. Web. doi:10.2172/797499.
KRISKOVICH, J.R. Master equipment list 500 CFM portable exhauster POR-005 skid C. United States. doi:10.2172/797499.
KRISKOVICH, J.R. 1999. "Master equipment list 500 CFM portable exhauster POR-005 skid C". United States. doi:10.2172/797499. https://www.osti.gov/servlets/purl/797499.
@article{osti_797499,
title = {Master equipment list 500 CFM portable exhauster POR-005 skid C},
author = {KRISKOVICH, J.R.},
abstractNote = {The Master Equipment List (MEL) lists all the major components of the 500 cfm exhauster PORO5. The purpose of this Master Equipment List is to provide basic information and references to other documents for the listed components.},
doi = {10.2172/797499},
journal = {},
number = ,
volume = ,
place = {United States},
year = 1999,
month = 7
}

Technical Report:

Save / Share:
  • This document provides storage requirements for 1,000 CFM portable exhausters POR-O07/Skid E and POR-008/Skid F. These requirements are presented in three parts: preparation for storage, storage maintenance and testing, and retrieval from storage. The exhauster component identification numbers listed in this document contain the prefix POR-007 or POR-008 depending on which exhauster is being used.
  • This Verification and Validation (V/V) interim report summarizes to date the results of the V/V tasks performed in each of the following life cycle phases: concept, requirements, design, implementation, test, installation and checkout, and operation and maintenance. At the end of the installation and checkout phase, the V/V final report will be issued. This interim report contains or references the following for each phase: Description of V/V tasks performed; Summary of task results; Summary of anomalies and resolution; Assessment of system quality; Recommendations.
  • The primary purpose of the two 1,000 CFM Exhauster Skids, POR-007-SKID E and POR-008-SKID F, is to provide backup to the waste tank primary ventilation systems for tanks 241-C-106 and 241-AY-102, and the AY-102 annulus in the event of a failure during the sluicing of tank 241-C-106 and subsequent transfer of sluiced waste to 241-AY-102. This redundancy is required since both of the tank ventilation systems have been declared as Safety Class systems.
  • This Acceptance Test Plan is for a 500 CFM Portable Exhauster POR-006 to be used for saltwell pumping. The Portable Exhauster System will be utilized to eliminate potential flammable gases that may exist within the dome space of the tank. This Acceptance Plan will test and verify that the exhauster meets the specified design criteria, safety requirements, operations requirements, and will provide a record of the functional test results.
  • This Acceptance Test Plan is for a 500 CFM Portable Exhauster POR-005 to be used for saltwell pumping. The Portable Exhauster System will be utilized to eliminate potential flammable gases that may exist within the dome space of the tank. This Acceptance Plan will test and verify that the exhauster meets the specified design criteria, safety requirements, operations requirements, and will provide a record of the functional test results.