EARLY ENTRANCE CO-PRODUCTION PLANT - DECENTRALIZED GASIFICATION COGENERATION TRANSPORTATION FUELS AND STEAM FROM AVAILABLE FEEDSTOCKS
Abstract
Waste Processors Management, Inc. (WMPI), along with its subcontractors Texaco Power & Gasification, SASOL Technology Ltd., and Nexant Inc. entered into a Cooperative Agreement DE-FC26-00NT40693 with the US Department of Energy (DOE), National Energy Technology Laboratory (NETL) to assess the techno-economic viability of building an Early Entrance Co-Production Plant (EECP) in the US to produce ultra clean Fischer-Tropsch (FT) transportation fuels with either power or steam as the major co-product. The EECP designs emphasize on recovery and gasification of low-cost coal waste (culm) from coal clean operations and will assess blends of the culm and coal or petroleum coke as feedstocks. The project is being carried out in three phases. Phase I involves definition of concept and engineering feasibility study to identify areas of technical, environmental and financial risk. Phase II consists of an experimental testing program designed to validate the coal waste mixture gasification performance. Phase III involves updating the original EECP design, based on results from Phase II, to prepare a preliminary engineering design package and financial plan for obtaining private funding to build a 5,000 BPD coal gasification/liquefaction plant next to an existing co-generation plant in Gilberton, Schuylkill County, Pennsylvania.
- Authors:
- Publication Date:
- Research Org.:
- National Energy Technology Laboratory (NETL), Pittsburgh, PA, Morgantown, WV, and Albany, OR (United States)
- Sponsoring Org.:
- US Department of Energy (US)
- OSTI Identifier:
- 795257
- Report Number(s):
- FC26-00NT40693-03
TRN: US200212%%22
- DOE Contract Number:
- FC26-00NT40693
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 1 Dec 2001
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 01 COAL, LIGNITE, AND PEAT; 02 PETROLEUM; 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; 20 FOSSIL-FUELED POWER PLANTS; DUAL-PURPOSE POWER PLANTS; COAL GASIFICATION; MIXTURES; PETROLEUM PRODUCTS; CULM; COKE; PERFORMANCE TESTING; AUTOMOTIVE FUELS; STEAM GENERATION; POWER GENERATION; FEASIBILITY STUDIES; PENNSYLVANIA
Citation Formats
Unknown,. EARLY ENTRANCE CO-PRODUCTION PLANT - DECENTRALIZED GASIFICATION COGENERATION TRANSPORTATION FUELS AND STEAM FROM AVAILABLE FEEDSTOCKS. United States: N. p., 2001.
Web. doi:10.2172/795257.
Unknown,. EARLY ENTRANCE CO-PRODUCTION PLANT - DECENTRALIZED GASIFICATION COGENERATION TRANSPORTATION FUELS AND STEAM FROM AVAILABLE FEEDSTOCKS. United States. https://doi.org/10.2172/795257
Unknown,. 2001.
"EARLY ENTRANCE CO-PRODUCTION PLANT - DECENTRALIZED GASIFICATION COGENERATION TRANSPORTATION FUELS AND STEAM FROM AVAILABLE FEEDSTOCKS". United States. https://doi.org/10.2172/795257. https://www.osti.gov/servlets/purl/795257.
@article{osti_795257,
title = {EARLY ENTRANCE CO-PRODUCTION PLANT - DECENTRALIZED GASIFICATION COGENERATION TRANSPORTATION FUELS AND STEAM FROM AVAILABLE FEEDSTOCKS},
author = {Unknown,},
abstractNote = {Waste Processors Management, Inc. (WMPI), along with its subcontractors Texaco Power & Gasification, SASOL Technology Ltd., and Nexant Inc. entered into a Cooperative Agreement DE-FC26-00NT40693 with the US Department of Energy (DOE), National Energy Technology Laboratory (NETL) to assess the techno-economic viability of building an Early Entrance Co-Production Plant (EECP) in the US to produce ultra clean Fischer-Tropsch (FT) transportation fuels with either power or steam as the major co-product. The EECP designs emphasize on recovery and gasification of low-cost coal waste (culm) from coal clean operations and will assess blends of the culm and coal or petroleum coke as feedstocks. The project is being carried out in three phases. Phase I involves definition of concept and engineering feasibility study to identify areas of technical, environmental and financial risk. Phase II consists of an experimental testing program designed to validate the coal waste mixture gasification performance. Phase III involves updating the original EECP design, based on results from Phase II, to prepare a preliminary engineering design package and financial plan for obtaining private funding to build a 5,000 BPD coal gasification/liquefaction plant next to an existing co-generation plant in Gilberton, Schuylkill County, Pennsylvania.},
doi = {10.2172/795257},
url = {https://www.osti.gov/biblio/795257},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sat Dec 01 00:00:00 EST 2001},
month = {Sat Dec 01 00:00:00 EST 2001}
}