skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Emplacement Drift System Description Document

Technical Report ·
DOI:https://doi.org/10.2172/790322· OSTI ID:790322

The Emplacement Drift System is part of the Engineered Barrier System and provides the interface between the various waste package (WP) systems and the Ground Control System. In conjunction with the various WPs, the Emplacement Drift System limits the release and transport of radionuclides from the WP to the Natural Barrier following waste emplacement. Collectively, the Emplacement Drift System consists of the structural support hardware (emplacement drift invert and WP emplacement pallet) and any performance-enhancing barriers (drip shields and invert ballast) installed or placed in the emplacement drifts. The Emplacement Drift System is entirely located within the emplacement drifts in the subsurface portion of the Monitored Geologic Repository (MGR); specifically, it is physically bounded by the Subsurface Facility System, the Ground Support System, and the Natural Barrier. The Emplacement Drift System supports the key MGR functions of limiting radionuclide release to the Natural Barrier, minimizing the likelihood of a criticality external to the WPs, limiting natural and induced environmental effects, and providing WP support. The Emplacement Drift System limits radionuclide release to the Natural Barrier by controlling the movement of radionuclides within the emplacement drift and to the Natural Barrier, and by limiting water contact with the WPs. The Emplacement Drift System provides physical support and barriers for emplaced WPs that reduce water contact. The Emplacement Drift WP spacing supports the thermal loading performance by complimenting drift layout and orientation as described in the system description document for the Subsurface Facility System. The Emplacement Drift System supports the WP and also provides an environment that aids in enhancing WP confinement performance. As part of the Engineered Barrier System, the Emplacement Drift System interfaces with the WP systems. The Emplacement Drift System also interfaces with the Natural Barrier, Subsurface Facility System, and Ground Control System for the space and location of emplaced WPs, for the controlled release of radionuclides, and for controlling the heat, chemical, and physical effects that interact between these systems. The Emplacement Drift System interfaces with the Subsurface Ventilation System for preclosure heat removal from WPs. The Emplacement Drift System interfaces with the Waste Emplacement/Retrieval System and the Performance Confirmation Emplacement Drift Monitoring System for equipment clearance for the emplacement, retrieval, and monitoring of waste.

Research Organization:
Yucca Mountain Project, Las Vegas, NV (United States)
Sponsoring Organization:
US Department of Energy (US)
OSTI ID:
790322
Report Number(s):
MOL.20010927.0074; SDD-EDS-SE-000001, Rev. 01, ICN 01, DC28628; TRN: US0201270
Resource Relation:
Other Information: PBD: 31 Jul 2001
Country of Publication:
United States
Language:
English

Similar Records

Subsurface Contamination Control
Technical Report · Wed Dec 12 00:00:00 EST 2001 · OSTI ID:790322

Subsurface Contamination Control
Technical Report · Fri Nov 16 00:00:00 EST 2001 · OSTI ID:790322

Uncanistered Spent Nuclear fuel Disposal Container System Description Document
Technical Report · Thu Oct 12 00:00:00 EDT 2000 · OSTI ID:790322