Abstract

One of the major tasks of this project is to design and fabricate an Advanced ElectroCore field prototype system. The system is designed to handle 5,000 acfm of exhaust gas from a coal-fired power plant. The system consists of the Advanced ElectroCore module, a water-cooled precharger and a dry scrubber. The system is shown in Figure 1. LSR has completed the design drawings for the ElectroCore module and the water-cooled precharger. The design drawings for the dry scrubber are nearly complete. Merrick Environmental Technology, Inc. has completed most of the fabrication drawings for the ElectroCore module and for the water-cooled precharger. From the original schedule, the design task (Task 2) should have been completed by 15 July 2000. It now looks like this task will be finished by mid-October thereby putting the project about two months behind schedule. Much of the delay is due to design changes that will make this field prototype easier to transport and erect. These changes will make the unit much more valuable as an ElectroCore system sales tool at the end of this project.

Authors:
Publication Date:
Research Org.:
National Energy Technology Laboratory (NETL), Pittsburgh, PA, Morgantown, WV, and Albany, OR (United States)
Sponsoring Org.:
US Department of Energy (US)
OSTI Identifier:
789054
Report Number(s):
FC26-00NT40757-02
TRN: AH200137%%300
DOE Contract Number:  
FC26-00NT40757
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 1 Oct 2000
Country of Publication:
United States
Language:
English
Subject:
01 COAL, LIGNITE, AND PEAT; 20 FOSSIL-FUELED POWER PLANTS; DESIGN; DRY SCRUBBERS; FABRICATION; FOSSIL-FUEL POWER PLANTS; FLY ASH; COAL; AIR POLLUTION CONTROL; POLLUTION CONTROL EQUIPMENT

Citation Formats

Unknown,. INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS. United States: N. p., 2000. Web. doi:10.2172/789054.
Unknown,. INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS. United States. https://doi.org/10.2172/789054
Unknown,. 2000. "INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS". United States. https://doi.org/10.2172/789054. https://www.osti.gov/servlets/purl/789054.
@article{osti_789054,
title = {INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS},
author = {Unknown,},
abstractNote = {One of the major tasks of this project is to design and fabricate an Advanced ElectroCore field prototype system. The system is designed to handle 5,000 acfm of exhaust gas from a coal-fired power plant. The system consists of the Advanced ElectroCore module, a water-cooled precharger and a dry scrubber. The system is shown in Figure 1. LSR has completed the design drawings for the ElectroCore module and the water-cooled precharger. The design drawings for the dry scrubber are nearly complete. Merrick Environmental Technology, Inc. has completed most of the fabrication drawings for the ElectroCore module and for the water-cooled precharger. From the original schedule, the design task (Task 2) should have been completed by 15 July 2000. It now looks like this task will be finished by mid-October thereby putting the project about two months behind schedule. Much of the delay is due to design changes that will make this field prototype easier to transport and erect. These changes will make the unit much more valuable as an ElectroCore system sales tool at the end of this project.},
doi = {10.2172/789054},
url = {https://www.osti.gov/biblio/789054}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Oct 01 00:00:00 EDT 2000},
month = {Sun Oct 01 00:00:00 EDT 2000}
}