Title: EARLY ENTRANCE COPRODUCTION PLANT

Abstract

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or other carbonaceous feedstock. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site and to develop a Research, Development, and Testing Plan (RD and T) for implementation in Phase II. The objective of Phase II is to implement the RD and T as outlined in the Phase I RD and T Plan to enhance the development and commercial acceptance of coproduction technology that produces high-value products, particularly those that are critical to our domestic fuel and power requirements. The project will resolve critical knowledge and technology gaps on the integration of gasification and downstream processing to coproduce some combination of power, fuels, and chemicals from coal and other feedstocks. The objective of Phase III is to develop an engineering design package and a financing plan formore » an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information that will be needed to move the EECP forward to detailed design, construction, and operation by industry.« less

Authors:
; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ;
Publication Date:
Research Org.:
National Energy Technology Laboratory (NETL), Pittsburgh, PA, Morgantown, WV, and Albany, OR (United States)
Sponsoring Org.:
US Department of Energy (US)
OSTI Identifier:
788759
Report Number(s):
FC26-99FT40658-10
TRN: AH200136%%121
DOE Contract Number:  
FC26-99FT40658
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 26 Oct 2000
Country of Publication:
United States
Language:
English
Subject:
01 COAL, LIGNITE, AND PEAT; COAL; CONSTRUCTION; DESIGN; ELECTRIC POWER; FINANCING; GASIFICATION; IMPLEMENTATION; SYNTHESIS GAS; TESTING

Citation Formats

Abughazaleh, John S, Ahmed, Mushtaq, Anand, Ashok, Anderson, John H, Benham, Charles, Brent, Fred D, Chance, Thomas E, Davis, William K, Drnevich, Raymond F, Hall, Larry, He, Ming, Lang, Stephen A, Ong, Jimmy O, Patel, Sarah J, Potoczniak, George, Sanchez, Adela G, Schrader, Charles H, Shah, Lalit S, Shires, Phil J, and Song, Rae. EARLY ENTRANCE COPRODUCTION PLANT. United States: N. p., 2000. Web. doi:10.2172/788759.
Abughazaleh, John S, Ahmed, Mushtaq, Anand, Ashok, Anderson, John H, Benham, Charles, Brent, Fred D, Chance, Thomas E, Davis, William K, Drnevich, Raymond F, Hall, Larry, He, Ming, Lang, Stephen A, Ong, Jimmy O, Patel, Sarah J, Potoczniak, George, Sanchez, Adela G, Schrader, Charles H, Shah, Lalit S, Shires, Phil J, & Song, Rae. EARLY ENTRANCE COPRODUCTION PLANT. United States. https://doi.org/10.2172/788759
Abughazaleh, John S, Ahmed, Mushtaq, Anand, Ashok, Anderson, John H, Benham, Charles, Brent, Fred D, Chance, Thomas E, Davis, William K, Drnevich, Raymond F, Hall, Larry, He, Ming, Lang, Stephen A, Ong, Jimmy O, Patel, Sarah J, Potoczniak, George, Sanchez, Adela G, Schrader, Charles H, Shah, Lalit S, Shires, Phil J, and Song, Rae. 2000. "EARLY ENTRANCE COPRODUCTION PLANT". United States. https://doi.org/10.2172/788759. https://www.osti.gov/servlets/purl/788759.
@article{osti_788759,
title = {EARLY ENTRANCE COPRODUCTION PLANT},
author = {Abughazaleh, John S and Ahmed, Mushtaq and Anand, Ashok and Anderson, John H and Benham, Charles and Brent, Fred D and Chance, Thomas E and Davis, William K and Drnevich, Raymond F and Hall, Larry and He, Ming and Lang, Stephen A and Ong, Jimmy O and Patel, Sarah J and Potoczniak, George and Sanchez, Adela G and Schrader, Charles H and Shah, Lalit S and Shires, Phil J and Song, Rae},
abstractNote = {The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or other carbonaceous feedstock. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site and to develop a Research, Development, and Testing Plan (RD and T) for implementation in Phase II. The objective of Phase II is to implement the RD and T as outlined in the Phase I RD and T Plan to enhance the development and commercial acceptance of coproduction technology that produces high-value products, particularly those that are critical to our domestic fuel and power requirements. The project will resolve critical knowledge and technology gaps on the integration of gasification and downstream processing to coproduce some combination of power, fuels, and chemicals from coal and other feedstocks. The objective of Phase III is to develop an engineering design package and a financing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information that will be needed to move the EECP forward to detailed design, construction, and operation by industry.},
doi = {10.2172/788759},
url = {https://www.osti.gov/biblio/788759}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Oct 26 00:00:00 EDT 2000},
month = {Thu Oct 26 00:00:00 EDT 2000}
}