skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Technical design aspects of Feasibility Study-II

Abstract

Feasibility Study-II examined a high-performance Neutrino Factory providing 1 x 10{sup 20} neutrinos per year aimed at a long-baseline detector. The Study was sponsored jointly by BNL and the Neutrino Factory and Muon Collider Collaboration ration (MC) and is based on a 1 MW proton driver operating at 24 GeV, i.e., an upgraded version of the AGS accelerator. Compared with the earlier FNAL-sponsored study (Feasibility Study-I), there is a sixfold improvement in performance. Here we describe details of the implementation of Study-II concepts and discuss their efficacy. Alternative approaches that will be pursued in follow-on R and D activities are also described briefly.

Authors:
Publication Date:
Research Org.:
Lawrence Berkeley National Lab., CA (US)
Sponsoring Org.:
USDOE Director, Office of Science. Office of High Energy and Nuclear Physics. Division of High Energy Physics (US)
OSTI Identifier:
787167
Report Number(s):
LBNL-48814
R&D Project: Z3MCMA; TRN: US0110438
DOE Contract Number:  
AC03-76SF00098
Resource Type:
Conference
Resource Relation:
Conference: The 3rd International Workshop on Neutrino Factories based on Muon Storage Rings, NuFACT'01, Tsukuba (JP), 05/24/2001--05/30/2001; Other Information: PBD: 15 Aug 2001
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS; DESIGN; IMPLEMENTATION; MUONS; NEUTRINOS; PERFORMANCE; PROTONS; STORAGE RINGS; FEASIBILITY STUDIES; NEUTRINO FACTORY MUON STORAGE RING

Citation Formats

Zisman, Michael S. Technical design aspects of Feasibility Study-II. United States: N. p., 2001. Web.
Zisman, Michael S. Technical design aspects of Feasibility Study-II. United States.
Zisman, Michael S. Wed . "Technical design aspects of Feasibility Study-II". United States. https://www.osti.gov/servlets/purl/787167.
@article{osti_787167,
title = {Technical design aspects of Feasibility Study-II},
author = {Zisman, Michael S.},
abstractNote = {Feasibility Study-II examined a high-performance Neutrino Factory providing 1 x 10{sup 20} neutrinos per year aimed at a long-baseline detector. The Study was sponsored jointly by BNL and the Neutrino Factory and Muon Collider Collaboration ration (MC) and is based on a 1 MW proton driver operating at 24 GeV, i.e., an upgraded version of the AGS accelerator. Compared with the earlier FNAL-sponsored study (Feasibility Study-I), there is a sixfold improvement in performance. Here we describe details of the implementation of Study-II concepts and discuss their efficacy. Alternative approaches that will be pursued in follow-on R and D activities are also described briefly.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Aug 15 00:00:00 EDT 2001},
month = {Wed Aug 15 00:00:00 EDT 2001}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: