skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Plutonium Immobilization Project Can Loading and Puck Handling Vision Software

Technical Report ·
DOI:https://doi.org/10.2172/786599· OSTI ID:786599

The U.S. Department of Energy will immobilize excess plutonium in the proposed Plutonium Immobilization Plant (PIP) at the Savannah River Site (SRS) as part of a two track approach for the disposition of weapons-usable plutonium. The Department of Energy is funding the development and testing effort for the PIP being conducted by Lawrence Livermore National Laboratory (LLNL), Westinghouse Savannah River Company (WSRC), Pacific Northwest National Laboratory (PNNL), and Argonne National Laboratory (ANL). The PIP will utilize the ceramic can-in-canister technology in a process that mixes plutonium and uranium with ceramic formers and neutron absorbers, presses the mixture into a ceramic puck-like form, and sinters the pucks in a furnace. Once sintered, the pucks are loaded into cans, then cans are placed into magazines, and magazines are inserted into large canisters. The canisters will subsequently be filled with high-level waste glass in the Defense Waste Processing Facility for eventual disposal in a geologic repository. The PIP project is currently being suspended due to budget constraints. The suspension requires documenting the current status of all systems under development including the Can Loading Vision System and the Puck Handling Vision System. This report provides this documentation.

Research Organization:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC09-96SR18500
OSTI ID:
786599
Report Number(s):
WSRC-TR-2001-00333; TRN: US0108964
Resource Relation:
Other Information: PBD: 10 Sep 2001
Country of Publication:
United States
Language:
English

Similar Records

Remote handling in the Plutonium Immobilization Project: Puck packaging
Journal Article · Thu Jul 01 00:00:00 EDT 1999 · Transactions of the American Nuclear Society · OSTI ID:786599

Plutonium Immobilization Puck Handling
Conference · Tue Jan 26 00:00:00 EST 1999 · OSTI ID:786599

End-Effector Development for the PIP Puck Handling Robot
Conference · Wed Jan 03 00:00:00 EST 2001 · OSTI ID:786599