Project W-314 performance mock-up test procedure
The purpose of this Procedure is to assist construction in the pre-operational fabrication and testing of the pit leak detection system and the low point drain assembly by: (1) Control system testing of the pit leak detection system will be accomplished by actuating control switches and verifying that the control signal is initiated, liquid testing and overall operational requirements stated in HNF-SD-W314-PDS-003, ''Project Development Specification for Pit Leak Detection''. (2) Testing of the low point floor drain assembly by opening and closing the drain to and from the ''retracted'' and ''sealed'' positions. Successful operation of this drain will be to verify that the seal does not leak on the ''sealed'' position, the assembly holds liquid until the leak detector actuates and the assembly will operate from on top of the mock-up cover block.
- Research Organization:
- Hanford Site (HNF), Richland, WA (United States)
- Sponsoring Organization:
- US DOE Office of Environmental Management (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 782437
- Report Number(s):
- TWR-4064-REV0; TRN: US0204703
- Resource Relation:
- Other Information: PBD: 24 Jun 1999
- Country of Publication:
- United States
- Language:
- English
Similar Records
Acceptance test report for the AN valve pit leak detection and low point drain assembly mock up test procedure
Project W-314 acceptance test report HNF-4647 for HNF-4646 241-B pit leak detection ANB-WT-LDSTA-231 for project W-314