Title: Project W-314 performance mock-up test procedure

Technical Report ·
DOI:https://doi.org/10.2172/782437· OSTI ID:782437

The purpose of this Procedure is to assist construction in the pre-operational fabrication and testing of the pit leak detection system and the low point drain assembly by: (1) Control system testing of the pit leak detection system will be accomplished by actuating control switches and verifying that the control signal is initiated, liquid testing and overall operational requirements stated in HNF-SD-W314-PDS-003, ''Project Development Specification for Pit Leak Detection''. (2) Testing of the low point floor drain assembly by opening and closing the drain to and from the ''retracted'' and ''sealed'' positions. Successful operation of this drain will be to verify that the seal does not leak on the ''sealed'' position, the assembly holds liquid until the leak detector actuates and the assembly will operate from on top of the mock-up cover block.

Research Organization:
Hanford Site (HNF), Richland, WA (United States)
Sponsoring Organization:
US DOE Office of Environmental Management (US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
782437
Report Number(s):
TWR-4064-REV0; TRN: US0204703
Resource Relation:
Other Information: PBD: 24 Jun 1999
Country of Publication:
United States
Language:
English