Hydrogen Generation Rate During Melter Feed Preparation of Tank 42 Sludge and CST in the Defense Waste Processing Facility
This document details the testing performed to determine the maximum hydrogen generation expected with a coupled flowsheet of sludge, CST, and frit.
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- AC09-96SR18500
- OSTI ID:
- 780128
- Report Number(s):
- WSRC-TR-98-00297; TRN: US0103488
- Resource Relation:
- Other Information: PBD: 2 May 2001; PBD: 2 May 2001
- Country of Publication:
- United States
- Language:
- English
Similar Records
Hydrogen generation during melter feed preparation of Tank 42 sludge and salt washed loaded CST in the Defense Waste Processing Facility
Settling Rate Study for Melter Feed of Tank 42 Sludge and CST in the Defense Waste Processing Facility (DWPF)
Demonstration of the Defense Waste Processing Facility vitrification process for Tank 42 radioactive sludge -- Melter feed preparation
Technical Report
·
Wed Dec 08 00:00:00 EST 1999
·
OSTI ID:780128
Settling Rate Study for Melter Feed of Tank 42 Sludge and CST in the Defense Waste Processing Facility (DWPF)
Technical Report
·
Wed May 02 00:00:00 EDT 2001
·
OSTI ID:780128
Demonstration of the Defense Waste Processing Facility vitrification process for Tank 42 radioactive sludge -- Melter feed preparation
Conference
·
Thu Jul 01 00:00:00 EDT 1999
·
OSTI ID:780128
+2 more