skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: STATUS OF LICENSE PLANNING

Authors:
Publication Date:
Research Org.:
Yucca Mountain Project, Las Vegas, Nevada
Sponsoring Org.:
USDOE
OSTI Identifier:
778871
Report Number(s):
MOL.19981123.0458
DOE Contract Number:
DE-AC01-91RW00134
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English

Citation Formats

JACK N. BAILEY. STATUS OF LICENSE PLANNING. United States: N. p., 1998. Web. doi:10.2172/778871.
JACK N. BAILEY. STATUS OF LICENSE PLANNING. United States. doi:10.2172/778871.
JACK N. BAILEY. Tue . "STATUS OF LICENSE PLANNING". United States. doi:10.2172/778871. https://www.osti.gov/servlets/purl/778871.
@article{osti_778871,
title = {STATUS OF LICENSE PLANNING},
author = {JACK N. BAILEY},
abstractNote = {},
doi = {10.2172/778871},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jun 09 00:00:00 EDT 1998},
month = {Tue Jun 09 00:00:00 EDT 1998}
}

Technical Report:

Save / Share:
  • As U.S. nuclear power plants look to subsequent license renewal (SLR) to operate for a 20-year period beyond 60 years, the U.S. Nuclear Regulatory Commission and the industry will be addressing technical issues around the capability of long-lived passive components to meet their functionality objectives. A key challenge will be to better understand likely materials degradation mechanisms in these components and their impacts on component functionality and margins to safety. Research addressing many of the remaining technical gaps in these areas for SLR may greatly benefit from materials sampled from plants (decommissioned or operating). Because of the cost and inefficiencymore » of piecemeal sampling, there is a need for a strategic and systematic approach to sampling materials from structures, systems, and components (SSC) in both operating and decommissioned plants. This document describes a potential approach for sampling (harvesting) materials that focuses on prioritizing materials for sampling using a number of criteria. These criteria are based on an evaluation of technical gaps identified in the literature, research needs to address these technical gaps, and lessons learned from previous harvesting campaigns. The document also describes a process for planning future harvesting campaigns; such a plan would include an understanding of the harvesting priorities, available materials, and the planned use of the materials to address the technical gaps.« less
  • The US Nuclear Regulatory Commission (NRC) staff and consultants reviewed a Prototype License Application Safety Analysis Report (PLASAR) submitted by the US Department of Energy (DOE) for the earth-mounded concrete bunker (EMCB) alternative method of low-level radioactive waste disposal. The NRC reviewers relied extensively on the Standard Review Plan (SRP), Rev.1 (NUREG-1200), to evaluate the acceptability of the information provided in the EMCB PLASAR. The NRC staff selected certain review areas in the PLASAR for development of safety evaluation report input to provide examples of safety assessments that are necessary as part of a licensing review. Because of the fictitiousmore » nature of the assumed disposal site, and the decision to limit the review to essentially first-round review status, the NRC staff report is labeled a ''Safety Evaluation Status Report'' (SESR). Appendix A comprises the NRC review comments and questions on the information that DOE submitted in the PLASAR. The NRC concentrated its review on the design and operations-related portions of the EMCB PLASAR.« less
  • This manual focuses on preparing to meet NRC environmental requirements for license renewal. It describes a nuclear power plant`s day-to-day environmental protection activities and the relationship between these activities and a plan for preparing a license renewal environmental report supplement. This report is the second phase of a three-phased approach to satisfying license renewal environmental requirements. The first phase involved programmatic planning and resulted in identifying applicable requirements, an approach to meeting the requirements, and any ``fatal flaws`` (EPRI TR-10429 1). This phase involves planning for environmental life cycle management, including project planning for a license renewal environmental report supplementmore » (ERS). The third phase involves preparing an ERS.« less
  • Part A ccntains information regarding the Power Reactcr Development Company, which operates the reactor, other information required by the AEC, and the specific license application. Part B consists of 6 volumes which comprise studies of the reactor and plant design, normal operations, and commissioning operations; the system verification programs; and the reactor site and environment considerations. (T.F.H.)