skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Environmental Assessment and Finding of No Significant Impact: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership

Abstract

The scope of this environmental assessment (EA) is to analyze the potential consequences of the Proposed Action on human health and the environment. Accordingly, this EA contains an introduction to the site and the history of the Grand Junction Office (Chapter One), a description of the Purpose and Need for Agency Action (Chapter Two), a description of the Proposed Action and Alternatives (Chapter Three), and the description of the Affected Environment and the Environmental Consequences (Chapter Four). Resource categories addressed in this EA include geology, soils and topography, groundwater and surface water, floodplains and wetlands, land use and infrastructure, human health, ecological resources, cultural resources, air quality, noise, visual resources, solid and hazardous waste management, transportation, and socioeconomic and environmental justice.

Authors:
Publication Date:
Research Org.:
U.S. Department of Energy, Grand Junction Office (US)
Sponsoring Org.:
USDOE Office of NEPA Policy and Assistance (EH-42) (US)
OSTI Identifier:
768524
Report Number(s):
DOE/EA-1338
TRN: US200417%%160
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 25 Apr 2000
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; AIR QUALITY; CULTURAL RESOURCES; GEOLOGY; LAND USE; OWNERSHIP; SOILS; SURFACE WATERS; TOPOGRAPHY; WASTE MANAGEMENT; WETLANDS; EA; FONSI; GRANK JUNCTION OFFICE; PROPERTY

Citation Formats

N /A. Environmental Assessment and Finding of No Significant Impact: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership. United States: N. p., 2000. Web. doi:10.2172/768524.
N /A. Environmental Assessment and Finding of No Significant Impact: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership. United States. doi:10.2172/768524.
N /A. Tue . "Environmental Assessment and Finding of No Significant Impact: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership". United States. doi:10.2172/768524. https://www.osti.gov/servlets/purl/768524.
@article{osti_768524,
title = {Environmental Assessment and Finding of No Significant Impact: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership},
author = {N /A},
abstractNote = {The scope of this environmental assessment (EA) is to analyze the potential consequences of the Proposed Action on human health and the environment. Accordingly, this EA contains an introduction to the site and the history of the Grand Junction Office (Chapter One), a description of the Purpose and Need for Agency Action (Chapter Two), a description of the Proposed Action and Alternatives (Chapter Three), and the description of the Affected Environment and the Environmental Consequences (Chapter Four). Resource categories addressed in this EA include geology, soils and topography, groundwater and surface water, floodplains and wetlands, land use and infrastructure, human health, ecological resources, cultural resources, air quality, noise, visual resources, solid and hazardous waste management, transportation, and socioeconomic and environmental justice.},
doi = {10.2172/768524},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Apr 25 00:00:00 EDT 2000},
month = {Tue Apr 25 00:00:00 EDT 2000}
}

Technical Report:

Save / Share:
  • The US Department of Energy (DOE) has prepared a sitewide environmental assessment (EA) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Because DOE-GJPO regularly proposes and conducts many different on-site activities, DOE decided to evaluate these activities in one sitewide EA rather than in multiple, activity-specific documents. On the basis of the information and analyses presented in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined by themore » National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement is not required for facility operations, and DOE is issuing this Finding of No Significant Impact (FONSI).« less
  • The U.S. Department of Energy (DOE) proposes to implement a comprehensive management program to safely, efficiently, and effectively manage its potentially reusable low enriched uranium (LEU), normal uranium (NU), and depleted uranium (DU). Uranium materials, which are presently located at multiple sites, are to be consolidated by transporting the materials to one or several storage locations, to facilitate ultimate disposition. Management would include the storage, transport, and ultimate disposition of these materials. This action is needed because of DOE's current missions and functions; increasing budget pressures; the continuing need for good stewardship of resources, including materials in inventory; and continuingmore » DOE attention to considerations of environment, safety, and health. Also, increased pressure on the federal budget requires that DOE take a closer look at materials management in order to ensure maximum cost effectiveness. This includes an examination of feasible uses of this material, consistent with DOE's mission, as well as an examination of management methods that are consistent with environmental requirements and budgetary constraints. DOE needs to implement a long-term (greater than 20 years) management plan for its inventory of potentially reusable LEU, NU, and DU.« less
  • Bonneville Power Administration (BPA), Department of Energy (DOE), is proposing to fund the Idaho Department of Fish and Game (IDFG) Captive Rearing Initiative for Salmon River Chinook Salmon Program (IDFG Program). The IDFG Program is a small-scale research and production initiative designed to increase numbers of three weak but recoverable populations of spring/summer chinook salmon in the Salmon River drainage. This would increase numbers of spring/summer chinook salmon within the Snake River Spring/Summer Chinook Salmon Evolutionarily Significant Unit (ESU), and reduce population fragmentation within the ESU. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1301) evaluating the proposed IDFG Program. Basedmore » on the analysis in the EA, BPA has determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, as defined within the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).« less
  • This report presents information pertaining to environmental activities conducted during calendar year 1995 at the US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Environmental activities conducted at the GJPO facility during 1995 were associated with mixed-waste treatment, site remediation, off-site dose modeling, and radiological and nonradiological monitoring. As part of the GJPO Mixed-Waste Treatment Program, on-site treatability studies were conducted in 1995 that made use of pilot-scale evaporative-oxidation and thermal-desorption units and bench-scale stabilization. DOE-GJPO used some of its own mixed-waste as well as samples received from other DOE sites for these treatabilitymore » studies. These studies are expected to conclude in 1996. Removal of radiologically contaminated materials from GJPO facility buildings was conducted under the provisions of the Grand Junction Projects Office Remedial Action Project. Remediation activities included the removal of 394 metric tons of contaminated material from Buildings 18 and 28 and revegetation activities on the GJPO site; remediation was conducted in compliance with applicable permits.« less
  • The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52more » was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less