Title: Performance Confirmation Plan

Abstract

As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that i s affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, keymore » performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program.« less

Authors:
Publication Date:
Research Org.:
Yucca Mountain Project, Las Vegas, Nevada (US)
Sponsoring Org.:
US Department of Energy (US)
OSTI Identifier:
762950
Report Number(s):
TDR-PCS-SE-000001 REV 01 ICN 01
MOL.20000601.0196, DC No. 25497; TRN: US0402778
DOE Contract Number:  
AC08-91RW00134
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 19 May 2000; PBD: 19 May 2000
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; ACCURACY; CONSTRUCTION; MONITORING; PERFORMANCE; POSITIONING; REGULATIONS; SAFETY; TESTING; VALIDATION

Citation Formats

Lindner, E.N.. Performance Confirmation Plan. United States: N. p., 2000. Web. doi:10.2172/762950.
Lindner, E.N.. Performance Confirmation Plan. United States. doi:10.2172/762950.
Lindner, E.N.. Fri . "Performance Confirmation Plan". United States. doi:10.2172/762950. https://www.osti.gov/servlets/purl/762950.
@article{osti_762950,
title = {Performance Confirmation Plan},
author = {Lindner, E.N.},
abstractNote = {As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that i s affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, key performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program.},
doi = {10.2172/762950},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri May 19 00:00:00 EDT 2000},
month = {Fri May 19 00:00:00 EDT 2000}
}

Technical Report:

Save / Share: