Title: Yucca Mountain Milestone

Abstract

The Department of Energy project to determine if the Yucca Mountain site in Nevada is suitable for geologic disposal of high-level nuclear waste reached a major milestone in late April when a 25-foot-diameter tunnel boring machine ``holed through'' completing a five-mile-long, horseshoe-shaped excavation through the mountain. When the cutting-head of the giant machine broke through to daylight at the tunnel's south portal, it ended a 2 1/2-year excavation through the mountain that was completed ahead of schedule and with an outstanding safety record. Video of the event was transmitted live by satellite to Washington, DC, where it was watched by Secretary of Energy Frederico Pena and other high-level DOE officials, signifying the importance of the project's mission to find a repository for high-level nuclear waste and spent nuclear fuel produced by nuclear power plants. This critical undertaking is being performed by DOE's Office of Civilian Radioactive Waste Management (OCRWM). The tunnel is the major feature of the Exploratory Studies Facility (ESF), which serves as an underground laboratory for engineers and scientists to help determine if Yucca Mountain is suitable to serve as a repository for the safe disposal of high-level nuclear waste. Morrison Knudsen's Environmental/Government Group is providing design andmore » construction-management services on the project. The MK team is performing final design for the ESF and viability assessment design for the underground waste repository that will be built only if the site is found suitable for such a mission. In fact, if at anytime during the ESF phase, the site is found unsuitable, the studies will be stopped and the site restored to its natural state.« less

Authors:
Publication Date:
Research Org.:
Morrison Knudsen, Environmental Government Group, Las Vegas, NV (US)
Sponsoring Org.:
USDOE Office of Civilian Radioactive Waste Management (RW) (US)
OSTI Identifier:
757324
Report Number(s):
TPM-487
TRN: US0004605
DOE Contract Number:  
AC01-91RW00134
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 9 Jun 1997
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; EXCAVATION; YUCCA MOUNTAIN; RADIOACTIVE WASTE DISPOSAL; HIGH-LEVEL RADIOACTIVE WASTES; TUNNELS; RADIOACTIVE WASTE FACILITIES; SPENT FUELS; SITE CHARACTERIZATION

Citation Formats

Hunt, Rod. Yucca Mountain Milestone. United States: N. p., 1997. Web. doi:10.2172/757324.
Hunt, Rod. Yucca Mountain Milestone. United States. doi:10.2172/757324.
Hunt, Rod. Mon . "Yucca Mountain Milestone". United States. doi:10.2172/757324. https://www.osti.gov/servlets/purl/757324.
@article{osti_757324,
title = {Yucca Mountain Milestone},
author = {Hunt, Rod},
abstractNote = {The Department of Energy project to determine if the Yucca Mountain site in Nevada is suitable for geologic disposal of high-level nuclear waste reached a major milestone in late April when a 25-foot-diameter tunnel boring machine ``holed through'' completing a five-mile-long, horseshoe-shaped excavation through the mountain. When the cutting-head of the giant machine broke through to daylight at the tunnel's south portal, it ended a 2 1/2-year excavation through the mountain that was completed ahead of schedule and with an outstanding safety record. Video of the event was transmitted live by satellite to Washington, DC, where it was watched by Secretary of Energy Frederico Pena and other high-level DOE officials, signifying the importance of the project's mission to find a repository for high-level nuclear waste and spent nuclear fuel produced by nuclear power plants. This critical undertaking is being performed by DOE's Office of Civilian Radioactive Waste Management (OCRWM). The tunnel is the major feature of the Exploratory Studies Facility (ESF), which serves as an underground laboratory for engineers and scientists to help determine if Yucca Mountain is suitable to serve as a repository for the safe disposal of high-level nuclear waste. Morrison Knudsen's Environmental/Government Group is providing design and construction-management services on the project. The MK team is performing final design for the ESF and viability assessment design for the underground waste repository that will be built only if the site is found suitable for such a mission. In fact, if at anytime during the ESF phase, the site is found unsuitable, the studies will be stopped and the site restored to its natural state.},
doi = {10.2172/757324},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1997},
month = {6}
}