Title: Design-only conceptual design report: Plutonium Immobilization Plant

Abstract

This design-only conceptual design report was prepared to support a funding request by the Department of Energy Office of Fissile Materials Disposition for engineering and design of the Plutonium Immobilization Plant, which will be used to immobilize up to 50 tonnes of surplus plutonium. The Plutonium Immobilization Plant will be located at the Savannah River Site pursuant to the Surplus Plutonium Disposition Final Environmental Impact Statement Record of Decision, January 4, 2000. This document reflects a new facility using the ceramic immobilization technology and the can-in-canister approach. The Plutonium Immobilization Plant accepts plutonium oxide from pit conversion and plutonium and plutonium oxide from non-pit sources and, through a ceramic immobilization process, converts the plutonium into mineral-like forms that are subsequently encapsulated within a large canister of high-level waste glass. The final immobilized product must make the plutonium as inherently unattractive and inaccessible for use in nuclear weapons as the plutonium in spent fuel from commercial reactors; it must also be suitable for geologic disposal. Plutonium immobilization at the Savannah River Site uses a new building, the Plutonium Immobilization Plant, which will receive and store feed materials, convert non-pit surplus plutonium to an oxide form suitable for the immobilization process, immobilizemore » the plutonium oxide in a titanate-based ceramic form, place cans of the plutonium-ceramic forms into magazines, and load the magazines into a canister. The existing Defense Waste Processing Facility is used for the pouring of high-level waste glass into the canisters. The Plutonium Immobilization Plant uses existing Savannah River Site infrastructure for analytical laboratory services, waste handling, fire protection, training, and other support utilities and services. This design-only conceptual design report also provides the cost for a Plutonium Immobilization Plant which would process and immobilize 17 tonnes of plutonium in ten years. The project schedule for either case is shown in a table.« less

Authors:
Publication Date:
Research Org.:
Lawrence Livermore National Lab., CA (US)
Sponsoring Org.:
USDOE Office of Defense Programs (DP) (US)
OSTI Identifier:
757034
Report Number(s):
UCRL-ID-131617-Rev.2; GA0102011
GA0102011; TRN: US0004125
DOE Contract Number:  
W-7405-ENG-48
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 1 May 2000
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; RADIOACTIVE WASTE FACILITIES; DESIGN; PLUTONIUM; SAVANNAH RIVER PLANT; RADIOACTIVE WASTE PROCESSING; CERAMIC MELTERS; WASTE FORMS; NUCLEAR WEAPONS DISMANTLEMENT; COST ESTIMATION

Citation Formats

DiSabatino, A A. Design-only conceptual design report: Plutonium Immobilization Plant. United States: N. p., 2000. Web. doi:10.2172/757034.
DiSabatino, A A. Design-only conceptual design report: Plutonium Immobilization Plant. United States. doi:10.2172/757034.
DiSabatino, A A. Mon . "Design-only conceptual design report: Plutonium Immobilization Plant". United States. doi:10.2172/757034. https://www.osti.gov/servlets/purl/757034.
@article{osti_757034,
title = {Design-only conceptual design report: Plutonium Immobilization Plant},
author = {DiSabatino, A A},
abstractNote = {This design-only conceptual design report was prepared to support a funding request by the Department of Energy Office of Fissile Materials Disposition for engineering and design of the Plutonium Immobilization Plant, which will be used to immobilize up to 50 tonnes of surplus plutonium. The Plutonium Immobilization Plant will be located at the Savannah River Site pursuant to the Surplus Plutonium Disposition Final Environmental Impact Statement Record of Decision, January 4, 2000. This document reflects a new facility using the ceramic immobilization technology and the can-in-canister approach. The Plutonium Immobilization Plant accepts plutonium oxide from pit conversion and plutonium and plutonium oxide from non-pit sources and, through a ceramic immobilization process, converts the plutonium into mineral-like forms that are subsequently encapsulated within a large canister of high-level waste glass. The final immobilized product must make the plutonium as inherently unattractive and inaccessible for use in nuclear weapons as the plutonium in spent fuel from commercial reactors; it must also be suitable for geologic disposal. Plutonium immobilization at the Savannah River Site uses a new building, the Plutonium Immobilization Plant, which will receive and store feed materials, convert non-pit surplus plutonium to an oxide form suitable for the immobilization process, immobilize the plutonium oxide in a titanate-based ceramic form, place cans of the plutonium-ceramic forms into magazines, and load the magazines into a canister. The existing Defense Waste Processing Facility is used for the pouring of high-level waste glass into the canisters. The Plutonium Immobilization Plant uses existing Savannah River Site infrastructure for analytical laboratory services, waste handling, fire protection, training, and other support utilities and services. This design-only conceptual design report also provides the cost for a Plutonium Immobilization Plant which would process and immobilize 17 tonnes of plutonium in ten years. The project schedule for either case is shown in a table.},
doi = {10.2172/757034},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2000},
month = {5}
}

Technical Report:

Save / Share: