Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam; Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1995-1996 Annual Report.
Abstract
This project began in July 1986 and is a cooperative effort of federal, state, and tribal fisheries entities to determine (1) the status and habitat requirements, and (2) effects of mitigative measures on productivity of white sturgeon populations in the lower Colombia and Snake rivers.
- Authors:
-
- Oregon Department of Fish and Wildlife, Portland, OR
- Publication Date:
- Research Org.:
- Bonneville Power Administration, Portland, OR (US)
- Sponsoring Org.:
- US Department of Energy (US)
- OSTI Identifier:
- 756165
- Report Number(s):
- DOE/BP-63584-11
R&D Project: 198605000; TRN: US0002688
- DOE Contract Number:
- 1986BP63584
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 1 Jul 1997
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 13 HYDRO ENERGY; HYDROELECTRIC POWER PLANTS; COLUMBIA RIVER; ENVIRONMENTAL IMPACTS; FISHERIES; PRODUCTIVITY; HABITAT; FISHES; DAMS; MITIGATION; White sturgeons - Habitat - Columbia River
Citation Formats
Rien, Thomas A, and Beiningen, Kirk T. Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam; Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1995-1996 Annual Report.. United States: N. p., 1997.
Web. doi:10.2172/756165.
Rien, Thomas A, & Beiningen, Kirk T. Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam; Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1995-1996 Annual Report.. United States. https://doi.org/10.2172/756165
Rien, Thomas A, and Beiningen, Kirk T. Tue .
"Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam; Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1995-1996 Annual Report.". United States. https://doi.org/10.2172/756165. https://www.osti.gov/servlets/purl/756165.
@article{osti_756165,
title = {Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam; Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1995-1996 Annual Report.},
author = {Rien, Thomas A and Beiningen, Kirk T},
abstractNote = {This project began in July 1986 and is a cooperative effort of federal, state, and tribal fisheries entities to determine (1) the status and habitat requirements, and (2) effects of mitigative measures on productivity of white sturgeon populations in the lower Colombia and Snake rivers.},
doi = {10.2172/756165},
url = {https://www.osti.gov/biblio/756165},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1997},
month = {7}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.