Title: Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam; Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1995-1996 Annual Report.

Abstract

This project began in July 1986 and is a cooperative effort of federal, state, and tribal fisheries entities to determine (1) the status and habitat requirements, and (2) effects of mitigative measures on productivity of white sturgeon populations in the lower Colombia and Snake rivers.

Authors:
;  [1]
  1. Oregon Department of Fish and Wildlife, Portland, OR
Publication Date:
Research Org.:
Bonneville Power Administration, Portland, OR (US)
Sponsoring Org.:
US Department of Energy (US)
OSTI Identifier:
756165
Report Number(s):
DOE/BP-63584-11
R&D Project: 198605000; TRN: US0002688
DOE Contract Number:  
1986BP63584
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 1 Jul 1997
Country of Publication:
United States
Language:
English
Subject:
13 HYDRO ENERGY; HYDROELECTRIC POWER PLANTS; COLUMBIA RIVER; ENVIRONMENTAL IMPACTS; FISHERIES; PRODUCTIVITY; HABITAT; FISHES; DAMS; MITIGATION; White sturgeons - Habitat - Columbia River

Citation Formats

Rien, Thomas A, and Beiningen, Kirk T. Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam; Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1995-1996 Annual Report.. United States: N. p., 1997. Web. doi:10.2172/756165.
Rien, Thomas A, & Beiningen, Kirk T. Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam; Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1995-1996 Annual Report.. United States. https://doi.org/10.2172/756165
Rien, Thomas A, and Beiningen, Kirk T. Tue . "Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam; Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1995-1996 Annual Report.". United States. https://doi.org/10.2172/756165. https://www.osti.gov/servlets/purl/756165.
@article{osti_756165,
title = {Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam; Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1995-1996 Annual Report.},
author = {Rien, Thomas A and Beiningen, Kirk T},
abstractNote = {This project began in July 1986 and is a cooperative effort of federal, state, and tribal fisheries entities to determine (1) the status and habitat requirements, and (2) effects of mitigative measures on productivity of white sturgeon populations in the lower Colombia and Snake rivers.},
doi = {10.2172/756165},
url = {https://www.osti.gov/biblio/756165}, journal = {},
number = ,
volume = ,
place = {United States},
year = {1997},
month = {7}
}