Frequency tuning of the CEBAF upgrade cavities
Long-term plans for CEBAF at Jefferson Lab calls for achieving 12 GeV in the middle of the next decade and 24 GeV after 2010. In support of these plans, an Upgrade Cryomodule capable of providing more than twice the voltage of the existing ones is under development. One requirement is to operate the superconducting cavities, which are 40% longer than existing ones, at 2.5 times the original design gradient with the same amount of rf power. This puts stringent requirements on the accuracy of the frequency tuner: range of 400 kHz and resolution of 1 Hz. A new tuner design to meet these requirements is under development. This system avoids problem areas of previous designs by holding to the principles of not placing moving parts in the vacuum and/or low temperature space, and of having all drive components readily accessible for maintenance and replacement without cryomodule warm-up.
- Research Organization:
- Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
- Sponsoring Organization:
- USDOE Office of Energy Research (ER) (US)
- DOE Contract Number:
- AC05-84ER40150
- OSTI ID:
- 755239
- Report Number(s):
- DOE/ER/40150-1427; JLAB-ACT-99-05; TRN: US0002414
- Resource Relation:
- Conference: 1999 Particle Accelerator Conference, New York, NY (US), 03/29/1999--04/02/1999; Other Information: PBD: 1 Mar 1999
- Country of Publication:
- United States
- Language:
- English
Similar Records
Development and Testing of a Prototype Tuner for the CEBAF Upgrade Cryomodule
Upgrade of the CEBAF acceleration system