Title: Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

Abstract

The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility study (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.

Publication Date:
Research Org.:
Argonne National Lab., IL (US)
Sponsoring Org.:
US Department of Energy (US)
OSTI Identifier:
750812
Report Number(s):
DOE/OR/21548-571
TRN: US0003198
DOE Contract Number:  
W-31109-ENG-38
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 15 Jul 1999
Country of Publication:
United States
Language:
English
Subject:
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; 54 ENVIRONMENTAL SCIENCES; 45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEFENSE; MISSOURI; SITE CHARACTERIZATION; RISK ASSESSMENT; GROUND WATER; REMEDIAL ACTION; RADIOACTIVE WASTES; EXPLOSIVES; US DOD; US DOE; ENVIRONMENTAL IMPACTS

Citation Formats

NONE. Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri. United States: N. p., 1999. Web. doi:10.2172/750812.
NONE. Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri. United States. doi:10.2172/750812.
NONE. Thu . "Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri". United States. doi:10.2172/750812. https://www.osti.gov/servlets/purl/750812.
@article{osti_750812,
title = {Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri},
author = {NONE},
abstractNote = {The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility study (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.},
doi = {10.2172/750812},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1999},
month = {7}
}