Title: Pressurized fluidized bed combustion. Quarterly technical progress report, July--September 1976

Abstract

The pressurised fluidised bed combustor at the Leatherhead U.K. laboratory has been modified to operate with deeper beds and higher fluidisation velocities. Effluents will be characterised in detail under an additional analytical programme contracted through ERDA for EPA. The plant is now in the final stages of assembly. Commissioning of some sub-assemblies has taken place and Test 6 is now expected to start at the end of October.

Publication Date:
Research Org.:
National Research Development Corp., London (UK)
OSTI Identifier:
7311210
Alternate Identifier(s):
OSTI ID: 7311210
Report Number(s):
FE-1511-31
DOE Contract Number:  
EX-76-C-01-1511
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
01 COAL, LIGNITE, AND PEAT; 42 ENGINEERING; COAL; FLUIDIZED-BED COMBUSTION; RESEARCH PROGRAMS; FLUIDIZED-BED COMBUSTORS; DESIGN; EFFICIENCY; GASEOUS WASTES; NITROGEN OXIDES; PILOT PLANTS; SULFUR DIOXIDE; BURNERS; CARBONACEOUS MATERIALS; CHALCOGENIDES; CHEMICAL REACTIONS; COMBUSTION; COMBUSTORS; ENERGY SOURCES; FOSSIL FUELS; FUELS; FUNCTIONAL MODELS; NITROGEN COMPOUNDS; OXIDATION; OXIDES; OXYGEN COMPOUNDS; SULFUR COMPOUNDS; SULFUR OXIDES; THERMOCHEMICAL PROCESSES; WASTES 014000* -- Coal, Lignite, & Peat-- Combustion; 421000 -- Engineering-- Combustion Systems

Citation Formats

Not Available. Pressurized fluidized bed combustion. Quarterly technical progress report, July--September 1976. United States: N. p., 1976. Web.
Not Available. Pressurized fluidized bed combustion. Quarterly technical progress report, July--September 1976. United States.
Not Available. Fri . "Pressurized fluidized bed combustion. Quarterly technical progress report, July--September 1976". United States.
@article{osti_7311210,
title = {Pressurized fluidized bed combustion. Quarterly technical progress report, July--September 1976},
author = {Not Available},
abstractNote = {The pressurised fluidised bed combustor at the Leatherhead U.K. laboratory has been modified to operate with deeper beds and higher fluidisation velocities. Effluents will be characterised in detail under an additional analytical programme contracted through ERDA for EPA. The plant is now in the final stages of assembly. Commissioning of some sub-assemblies has taken place and Test 6 is now expected to start at the end of October.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1976},
month = {10}
}

Technical Report:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that may hold this item. Keep in mind that many technical reports are not cataloged in WorldCat.

Save / Share: