skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Multi-Hundred Watt Radioisotope Thermoelectric Generator Program, LES 8/9 Program, MJS Program. Bi-monthly progress report, 1 September--31 October 1974

Abstract

Significant events, activities and achievements on the MHW LES 8/9 and MJS Programs for the reporting period are reported. Topics discussed include programmatic, safety, systems, isotope heat source, converter, product assurance, acceptance testing, and converter fabrication. (TFD)

Publication Date:
Research Org.:
General Electric Co., Philadelphia, Pa. (USA). Space Div.
OSTI Identifier:
7186472
Report Number(s):
TID-27051
DOE Contract Number:
AT(29-2)-2831
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
07 ISOTOPES AND RADIATION SOURCES; 30 DIRECT ENERGY CONVERSION; THERMOELECTRIC GENERATORS; RESEARCH PROGRAMS; RADIOISOTOPE HEAT SOURCES; SPACECRAFT POWER SUPPLIES; DIRECT ENERGY CONVERTERS; ELECTRONIC EQUIPMENT; HEAT SOURCES; POWER SUPPLIES; NESDPS Office of Nuclear Energy Space and Defense Power Systems; 070301* - Isotopic Power Supplies- Design & Fabrication- (-1987); 300301 - Thermoelectric Generators- Design & Development

Citation Formats

Not Available. Multi-Hundred Watt Radioisotope Thermoelectric Generator Program, LES 8/9 Program, MJS Program. Bi-monthly progress report, 1 September--31 October 1974. United States: N. p., 1974. Web. doi:10.2172/7186472.
Not Available. Multi-Hundred Watt Radioisotope Thermoelectric Generator Program, LES 8/9 Program, MJS Program. Bi-monthly progress report, 1 September--31 October 1974. United States. doi:10.2172/7186472.
Not Available. Tue . "Multi-Hundred Watt Radioisotope Thermoelectric Generator Program, LES 8/9 Program, MJS Program. Bi-monthly progress report, 1 September--31 October 1974". United States. doi:10.2172/7186472. https://www.osti.gov/servlets/purl/7186472.
@article{osti_7186472,
title = {Multi-Hundred Watt Radioisotope Thermoelectric Generator Program, LES 8/9 Program, MJS Program. Bi-monthly progress report, 1 September--31 October 1974},
author = {Not Available},
abstractNote = {Significant events, activities and achievements on the MHW LES 8/9 and MJS Programs for the reporting period are reported. Topics discussed include programmatic, safety, systems, isotope heat source, converter, product assurance, acceptance testing, and converter fabrication. (TFD)},
doi = {10.2172/7186472},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Tue Jan 01 00:00:00 EST 1974},
month = {Tue Jan 01 00:00:00 EST 1974}
}

Technical Report:

Save / Share: