Title: A municipal guide to least cost utility planning

Abstract

The recent track record of traditional'' electricity planning, which entails selection of supply side resources to meet forecasted demand, has not been good. There are numerous examples of utilities incorrectly forecasting demand and over-building generating capacity while others underestimated growth and have had to cut demand and find alternate power sources to avoid outages. A potential solution to this problem is the continuing development of Least Cost Utility Plannning (LCUP). Regulatory commissions, consumer advocates and utilities are increasingly relying an LCUP as the most responsible way to avoid construction of new capacity and alleviate anticipated shortages caused by cancellation of construction projects, load growth, or natural replacement of aging capacity. The purpose of this report is to provide municipalities a starting point for evaluating their servicing utilities or states' least cost plan. This was accomplished by: Identifying key issues in LCUP; reviewing examples of the collaborative and classic approaches to LCUP in Illinois, California, New York State and Michigan; cataloging municipal authorities and strategies which can influence or support LCUP activities. Results of the project indicate that through a basic understanding of LCUP processes and issues, municipalities will be in a better position to influence plans or, if necessary, intervenemore » in regulatory proceedings where plans are adopted. Constraints to municipal involvement in LCUP include statutory limitations, resource constraints, and a lack of knowledge of indirect authorities that support the LCUP process.« less

Publication Date:
Research Org.:
Urban Consortium for Technology Initiatives (United States). Energy Task Force; Public Technology, Inc., Washington, DC (United States); Chicago Dept. of Environment, IL (United States)
Sponsoring Org.:
USDOE; USDOE, Washington, DC (United States)
OSTI Identifier:
7141237
Report Number(s):
DOE/IR/05106-T161
ON: DE93005624
DOE Contract Number:  
FG02-78IR05106
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; 24 POWER TRANSMISSION AND DISTRIBUTION; ELECTRIC UTILITIES; PLANNING; POWER DEMAND; RECOMMENDATIONS; LOCAL GOVERNMENT; FORECASTING; DEMAND; PUBLIC UTILITIES; 320603* - Energy Conservation, Consumption, & Utilization- Municipalities & Community Systems- Public Utilities- (1980-); 240700 - Power Transmission & Distribution- Economic, Industrial & Business Aspects- (1990-)

Citation Formats

. A municipal guide to least cost utility planning. United States: N. p., 1992. Web. doi:10.2172/7141237.
. A municipal guide to least cost utility planning. United States. https://doi.org/10.2172/7141237
. Sun . "A municipal guide to least cost utility planning". United States. https://doi.org/10.2172/7141237. https://www.osti.gov/servlets/purl/7141237.
@article{osti_7141237,
title = {A municipal guide to least cost utility planning},
author = {},
abstractNote = {The recent track record of traditional'' electricity planning, which entails selection of supply side resources to meet forecasted demand, has not been good. There are numerous examples of utilities incorrectly forecasting demand and over-building generating capacity while others underestimated growth and have had to cut demand and find alternate power sources to avoid outages. A potential solution to this problem is the continuing development of Least Cost Utility Plannning (LCUP). Regulatory commissions, consumer advocates and utilities are increasingly relying an LCUP as the most responsible way to avoid construction of new capacity and alleviate anticipated shortages caused by cancellation of construction projects, load growth, or natural replacement of aging capacity. The purpose of this report is to provide municipalities a starting point for evaluating their servicing utilities or states' least cost plan. This was accomplished by: Identifying key issues in LCUP; reviewing examples of the collaborative and classic approaches to LCUP in Illinois, California, New York State and Michigan; cataloging municipal authorities and strategies which can influence or support LCUP activities. Results of the project indicate that through a basic understanding of LCUP processes and issues, municipalities will be in a better position to influence plans or, if necessary, intervene in regulatory proceedings where plans are adopted. Constraints to municipal involvement in LCUP include statutory limitations, resource constraints, and a lack of knowledge of indirect authorities that support the LCUP process.},
doi = {10.2172/7141237},
url = {https://www.osti.gov/biblio/7141237}, journal = {},
number = ,
volume = ,
place = {United States},
year = {1992},
month = {3}
}