skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Brayton Isotope Power System (BIPS) facility specification

Abstract

General requirements for the Brayton Isotope Power System (BIPS)/Ground Demonstration System (GDS) assembly and test facility are defined. The facility will include provisions for a complete test laboratory for GDS checkout, performance, and endurance testing, and a contamination-controlled area for assembly, fabrication, storage, and storage preparation of GDS components. Specifications, schedules, and drawings are included.

Publication Date:
Research Org.:
AiResearch Mfg. Co. of Arizona, Phoenix (USA)
OSTI Identifier:
7129616
Report Number(s):
TID-27256
TRN: 77-005614
DOE Contract Number:
EY-76-C-03-1123
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
07 ISOTOPES AND RADIATION SOURCES; 42 ENGINEERING; BRAYTON CYCLE POWER SYSTEMS; DESIGN; SPACECRAFT POWER SUPPLIES; DIAGRAMS; RADIOISOTOPE HEAT SOURCES; ELECTRONIC EQUIPMENT; HEAT SOURCES; POWER SUPPLIES; NESDPS Office of Nuclear Energy Space and Defense Power Systems; 070301* - Isotopic Power Supplies- Design & Fabrication- (-1987); 425001 - Engineering- Power Cycles- Brayton- (1980-)

Citation Formats

Not Available. Brayton Isotope Power System (BIPS) facility specification. United States: N. p., 1976. Web. doi:10.2172/7129616.
Not Available. Brayton Isotope Power System (BIPS) facility specification. United States. doi:10.2172/7129616.
Not Available. Mon . "Brayton Isotope Power System (BIPS) facility specification". United States. doi:10.2172/7129616. https://www.osti.gov/servlets/purl/7129616.
@article{osti_7129616,
title = {Brayton Isotope Power System (BIPS) facility specification},
author = {Not Available},
abstractNote = {General requirements for the Brayton Isotope Power System (BIPS)/Ground Demonstration System (GDS) assembly and test facility are defined. The facility will include provisions for a complete test laboratory for GDS checkout, performance, and endurance testing, and a contamination-controlled area for assembly, fabrication, storage, and storage preparation of GDS components. Specifications, schedules, and drawings are included.},
doi = {10.2172/7129616},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon May 31 00:00:00 EDT 1976},
month = {Mon May 31 00:00:00 EDT 1976}
}

Technical Report:

Save / Share: