Title: Operating Years 1993 Through 1995 Power Purchases : Final Environmental Assessment.

Technical Report ·
DOI:https://doi.org/10.2172/6909494· OSTI ID:6909494

Bonneville Power Administration (BPA) is obligated to supply electric power to its contractual customers. Based on a forecast of growing customer loads and assuming Critical Period water conditions in the Columbia River Basin, BPA is planning to meet a firm energy deficit during the four operating years (OY) 1992 through 1995, i.e., August 1991 through July 1995. BPA has executed several power purchase agreements to cover the projected OY 1992 deficit. The proposed action is to extend two existing one-year power purchase agreements for an additional three years to cover the four-year Critical Period energy deficit. The extension of these two one-year power purchase agreements would: (1) increase BPA's firm energy load-carrying capability; (2) allow BPA to meet its firm energy contractual commitments over the remaining three years of the four-year Critical Period from August 1, 1992, to July 31, 1995; (3) provide flexibility for BPA's use of hydroelectric resources over the Critical Period; and (4) increase system reliability. Under Critical Period water conditions, absent the proposed action, projected loads would exceed the capability of the Federal power system to serve those loads. The purpose of BPA's proposed action is to assure consistency with its statutory responsibilities, including those found in the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act).

Research Organization:
USDOE Bonneville Power Administration, Portland, OR (United States)
Sponsoring Organization:
USDOE; USDOE, Washington, DC (United States)
OSTI ID:
6909494
Report Number(s):
DOE/BP-1758; ON: DE93002269; DOE/EA-0758
Country of Publication:
United States
Language:
English