Critical radionuclide/critical pathway analysis for the U.S. Department of Energy`s Savannah River Site
- Westinghouse Savannah River Co., Aiken, SC (United States). Savannah River Technology Center
Many different radionuclides have been released to the environment from the Savannah River Site (SRS) during the facility`s operational history. However, as shown by this analysis, only a small number of the released radionuclides have been significant contributors to potential doses and risks to off-site people. This article documents the radiological critical contaminant/critical pathway analysis performed for SRS. If site missions and operations remain constant over the next 30 years, only tritium oxide releases are projected to exceed a maximally exposed individual (MEI) risk of 1.0E-06 for either the airborne or liquid pathways. The critical exposure pathways associated with site airborne releases are inhalation and vegetation consumption, whereas the critical exposure pathways associated with liquid releases are drinking water and fish consumption. For the SRS-specific, nontypical exposure pathways (i.e., recreational fishing and deer and hog hunting), cesium-137 is the critical radionuclide.
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC09-89SR18035
- OSTI ID:
- 687381
- Journal Information:
- Risk Analysis, Vol. 19, Issue 3; Other Information: PBD: Jun 1999
- Country of Publication:
- United States
- Language:
- English
Similar Records
Long-Term Assessment of Critical Radionuclides and Associated Environmental Media at the Savannah River Site
Cs-137 Body-burdens in Wild Pigs on the Department of Energy's Savannah River Site: Determination of an Appropriate Framework for Spatiotemporal Analysis of Hunter Dose Tracking System Data