skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: A simulation of the red team ''hide-in-PNE'' (Peaceful Nuclear Explosion) scenario

Technical Report ·
OSTI ID:6871434

During the second phase of the ISA ''Path Game'' played at Booz Allen on February 26, 1987, the Red Team ''played'' the concealment of a test of a large weapon, the seismic signals of which were supposed to be hidden by a simultaneous PNE row charge explosion. This postulated event has been synthesized by a computer simulation (using seismic data from NTS events) for the geometry proposed by the Red Team. The accompanying figures present the seismic signals at stations in a local seismic net installed for the monitoring of such a PNE event. Based on the visual evaluation of the arriving signals, the concealment of the large test is confirmed.

Research Organization:
Eagle Research Group, Inc., Arlington, VA (USA)
OSTI ID:
6871434
Report Number(s):
NP-7900585; ON: TI87900585
Country of Publication:
United States
Language:
English