Title: X-616 Chromium Sludge Lagoons pictorial overview, Piketon, Ohio

Abstract

The Portsmouth Gaseous Diffusion Plant uses large quantities of water for process cooling. The X-616 Liquid Effluent Control Facility was placed in operation in December 1976 to treat recirculation cooling water blowdown from the process cooling system. A chromium-based corrosion inhibitor was used in the cooling water system. A chromium sludge was produced in a clarifier to control chromium levels in the water. Chromium sludge produced by this process was stored in two surface impoundments called the X-616 Chromium Sludge Lagoons. The sludge was toxic due to its chromium concentration and therefore required treatment. The sludge was treated, turning it into a sanitary waste, and buried in an Ohio EPA approved landfill. The plant's process cooling water system has changed to a more environmentally acceptable phosphate-based inhibitor. Closure activities at X-616 began in August 1990, with all construction activities completed in June 1991, at a total cost of $8.0 million.

Publication Date:
Research Org.:
Portsmouth Gaseous Diffusion Plant, OH (United States)
Sponsoring Org.:
DOE; USDOE, Washington, DC (United States)
OSTI Identifier:
6835070
Alternate Identifier(s):
OSTI ID: 6835070; Legacy ID: DE93002255
Report Number(s):
POEF/ER-4547
ON: DE93002255
DOE Contract Number:
AC05-76OR00001
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; 12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; PORTSMOUTH GASEOUS DIFFUSION PLANT; REMEDIAL ACTION; TOXIC MATERIALS; WASTE DISPOSAL; CHROMIUM; DECOMMISSIONING; SLUDGES; WASTE STORAGE; ELEMENTS; GASEOUS DIFFUSION PLANTS; HAZARDOUS MATERIALS; INDUSTRIAL PLANTS; ISOTOPE SEPARATION PLANTS; MANAGEMENT; MATERIALS; METALS; NATIONAL ORGANIZATIONS; NUCLEAR FACILITIES; STORAGE; TRANSITION ELEMENTS; US DOE; US ERDA; US ORGANIZATIONS; WASTE MANAGEMENT 054000* -- Nuclear Fuels-- Health & Safety; 052002 -- Nuclear Fuels-- Waste Disposal & Storage

Citation Formats

Not Available. X-616 Chromium Sludge Lagoons pictorial overview, Piketon, Ohio. United States: N. p., 1992. Web.
Not Available. X-616 Chromium Sludge Lagoons pictorial overview, Piketon, Ohio. United States.
Not Available. Thu . "X-616 Chromium Sludge Lagoons pictorial overview, Piketon, Ohio". United States. doi:.
@article{osti_6835070,
title = {X-616 Chromium Sludge Lagoons pictorial overview, Piketon, Ohio},
author = {Not Available},
abstractNote = {The Portsmouth Gaseous Diffusion Plant uses large quantities of water for process cooling. The X-616 Liquid Effluent Control Facility was placed in operation in December 1976 to treat recirculation cooling water blowdown from the process cooling system. A chromium-based corrosion inhibitor was used in the cooling water system. A chromium sludge was produced in a clarifier to control chromium levels in the water. Chromium sludge produced by this process was stored in two surface impoundments called the X-616 Chromium Sludge Lagoons. The sludge was toxic due to its chromium concentration and therefore required treatment. The sludge was treated, turning it into a sanitary waste, and buried in an Ohio EPA approved landfill. The plant's process cooling water system has changed to a more environmentally acceptable phosphate-based inhibitor. Closure activities at X-616 began in August 1990, with all construction activities completed in June 1991, at a total cost of $8.0 million.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Thu Oct 01 00:00:00 EDT 1992},
month = {Thu Oct 01 00:00:00 EDT 1992}
}

Technical Report:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that may hold this item. Keep in mind that many technical reports are not cataloged in WorldCat.

Save / Share:
  • The Portsmouth Gaseous Diffusion Plant uses large quantities of water for process cooling. The X-616 Liquid Effluent Control Facility was placed in operation in December 1976 to treat recirculation cooling water blowdown from the process cooling system. A chromium-based corrosion inhibitor was used in the cooling water system. A chromium sludge was produced in a clarifier to control chromium levels in the water. Chromium sludge produced by this process was stored in two surface impoundments called the X-616 Chromium Sludge Lagoons. The sludge was toxic due to its chromium concentration and therefore required treatment. The sludge was treated, turning itmore » into a sanitary waste, and buried in an Ohio EPA approved landfill. The plant`s process cooling water system has changed to a more environmentally acceptable phosphate-based inhibitor. Closure activities at X-616 began in August 1990, with all construction activities completed in June 1991, at a total cost of $8.0 million.« less
  • The US Department of Energy (DOE) must manage wastes containing polychlorinated biphenyls (PCBs) in accordance with Toxic Substances Control Act (TSCA) requirements and as prescribed in a Federal Facilities Compliance Agreement (FFCA) between DOE and the U.S. Environmental Protection Agency (EPA). PCB-containing wastes are currently stored in the PORTS process buildings where they are generated. DOE proposes to modify and expand the Waste Accountability facility (X-7725A) at the Portsmouth Gaseous Diffusion Plant (PORTS), Piketon, Ohio, to provide a central storage location for these wastes. The proposed action is needed to eliminate the fire and safety hazards presented by the wastes.more » In this EA, DOE considers four alternatives: (1) no action, which requires storing wastes in limited storage areas in existing facilities; (2) modifying and expanding the X-7725A waste accountability facility; (3) constructing a new PCB waste storage building; and (4) shipping PCB wastes to the K-25 TSCA incinerator. If no action is taken, PCB-contaminated would continue to be stored in Bldgs X-326, X-330, and X-333. As TSCA cleanup activities continue, the quantity of stored waste would increase, which would subsequently cause congestion in the three process buildings and increase fire and safety hazards. The preferred alternative is to modify and expand Bldg. X-7725A to store wastes generated by TSCA compliance activities. Construction, which could begin as early as April 1996, would last approximately five to seven months, with a total peak work force of 70.« less
  • This report describes the field-scale demonstration performed as part of the project, In Situ Treatment of Mixed Contaminants in Groundwater. This project was a 3{1/2} year effort comprised of laboratory work performed at Oak Ridge National Laboratory and fieldwork performed at the US Department of Energy (DOE) Portsmouth Gaseous Diffusion Plant (PORTS). The overall goal of the project was to evaluate in situ treatment of groundwater using horizontal recirculation coupled with treatment modules. Specifically, horizontal recirculation was tested because of its application to thin, interbedded aquifer zones. Mixed contaminants were targeted because of their prominence at DOE sites and becausemore » they cannot be treated with conventional methods. The project involved several research elements, including treatment process evaluation, hydrodynamic flow and transport modeling, pilot testing at an uncontaminated site, and full-scale testing at a contaminated site. This report presents the results of the work at the contaminated site, X-701B at PORTS. Groundwater contamination at X-701B consists of trichloroethene (TCE) (concentrations up to 1800 mg/L) and technetium-998 (Tc{sup 99}) (activities up to 926 pCi/L).« less
  • This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Portsmouth Uranium Enrichment Complex (PUEC), conducted August 4 through August 15, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Team specialists are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase ofmore » the Survey involves the review of existing site environmental data, observations of the operations performed at PUEC, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by Argonne National Laboratory. When completed, the results will be incorporated into the PUEC Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the PUEC Survey. 55 refs., 22 figs., 21 tabs.« less
  • The US Department of Energy (DOE), Office of Waste Management, proposes to construct and operate a solid waste landfill within the boundary of the Portsmouth Gaseous Diffusion Plant (PORTS), Piketon, Ohio. The purpose of the proposed action is to provide PORTS with additional landfill capacity for non-hazardous and asbestos wastes. The proposed action is needed to support continued operation of PORTS, which generates non-hazardous wastes on a daily basis and asbestos wastes intermittently. Three alternatives are evaluated in this environmental assessment (EA): the proposed action (construction and operation of the X-737 landfill), no-action, and offsite shipment of industrial solid wastesmore » for disposal.« less