skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Technical evaluation of the proposed design modifications and technical specification changes on grid voltage degradation (Part A) for the Rancho Seco Nuclear Generating Plant

Technical Report ·
DOI:https://doi.org/10.2172/6830844· OSTI ID:6830844

The Rancho Seco Nuclear Generating Plant has two 4160-volt and two 480-volt Class 1E buses. The existing undervoltage protection design uses a single undervoltage relay on each 4160-volt Class 1E bus. If the voltage drops below 3534 volts (85% of 4160 volts), the undervoltage relay will energize a set of load-shedding relays. The load-shedding relays initiate the disconnection of the emergency 4160-volt buses from the off-site source, load shed the emergency 4160-volt buses, start the emergency diesel generators, and provide an enabling signal for the load-sequencing timing circuit. When the emergency diesel generator reaches the required voltage it is connected to the emergency buses and load-sequencing will begin automatically, if a safety injection (SI) signal exists. The licensee has proposed a design change to establish an automatic degraded voltage protection circuitry. The modification consists of incorporating the existing undervoltage protection scheme will consist of 3 undervoltage relays monitoring each 4160-volt emergency bus. The 3 undervoltage relays will be arranged in a 2-out-of-3 coincident logic with a setpoint of 3771 volts +- 38 volts (90.6% of 4160 volts) with a time delay of 12 seconds +- 1.2 seconds.

Research Organization:
Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
6830844
Report Number(s):
UCID-18690; TRN: 81-000103
Country of Publication:
United States
Language:
English