Title: DOE/FETC GASIS project. Quarterly report, September 1--November 30, 1997

Abstract

This report summarizes technical progress on the GASIS [Gas AtlaS Information System] project during the quarter. During this period, work was performed on Task 3: Natural gas reservoir data system development, Task 4: Technology transfer, Task 8: Reservoir data system updates, and Task 9: Supplemental reservoir studies.

Publication Date:
Research Org.:
Energy and Environmental Analysis, Inc., Arlington, VA (United States)
Sponsoring Org.:
USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States)
OSTI Identifier:
663454
Report Number(s):
DOE/MC/28139-18
ON: DE98057970; TRN: AHC29818%%291
DOE Contract Number:
AC21-93MC28139
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: [1997]
Country of Publication:
United States
Language:
English
Subject:
03 NATURAL GAS; 99 MATHEMATICS, COMPUTERS, INFORMATION SCIENCE, MANAGEMENT, LAW, MISCELLANEOUS; PROGRESS REPORT; INFORMATION SYSTEMS; NATURAL GAS DEPOSITS; SITE CHARACTERIZATION; TECHNOLOGY TRANSFER; RESERVOIR ENGINEERING; GULF OF MEXICO; PERMIAN BASIN; WELL LOGGING

Citation Formats

NONE. DOE/FETC GASIS project. Quarterly report, September 1--November 30, 1997. United States: N. p., 1997. Web. doi:10.2172/663454.
NONE. DOE/FETC GASIS project. Quarterly report, September 1--November 30, 1997. United States. doi:10.2172/663454.
NONE. Wed . "DOE/FETC GASIS project. Quarterly report, September 1--November 30, 1997". United States. doi:10.2172/663454. https://www.osti.gov/servlets/purl/663454.
@article{osti_663454,
title = {DOE/FETC GASIS project. Quarterly report, September 1--November 30, 1997},
author = {NONE},
abstractNote = {This report summarizes technical progress on the GASIS [Gas AtlaS Information System] project during the quarter. During this period, work was performed on Task 3: Natural gas reservoir data system development, Task 4: Technology transfer, Task 8: Reservoir data system updates, and Task 9: Supplemental reservoir studies.},
doi = {10.2172/663454},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Dec 31 00:00:00 EST 1997},
month = {Wed Dec 31 00:00:00 EST 1997}
}

Technical Report:

Save / Share:
  • Progress is summarized for the following tasks: Natural gas reservoir data system development; Technology transfer; Software enhancement; and Supplemental reservoir studies and data collection. GASIS is a national database of geological, engineering, production, and ultimate recovery data for US gas reservoirs.
  • The FETC/EPRI Biomass Cofiring Program has completed one year of activity, accelerating the pace of cofiring development. Cofiring tests were completed at the Seward Generating Station of GPU Genco and at the Michigan City Generating Station of NIPSCO. The NYSEG work at Greenidge Station resulted in a workable, low cost method for injecting biofuels into coal-fired PC boilers. Support studies and modeling continued to provide analytics for the cofiring program. This report summarizes the activities during the fourth quarter of the FETC/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon the results of testing in order to highlight the progress atmore » utilities.« less
  • Technical progress on the GAS IS project during the quarter for contract no. DE-AC21 -93 MC281 39 is described. During this period, work was performed on Task 4 Technology Transfer, Task 7: Software Enhancement, Task 8: Reservoir Data System Updates, and Task 9: Supplemental Reservoir Studies.
  • Tasks which were performed in this period are: (1) Natural Gas Reservoir Data System Development, (2) Technology Transfer, (3) Storage Media, (4) Reservoir Data System Updates, and (5) Supplemental Reservoir Studies.
  • The FETC/EPRI Biomass Cofiring Program has accelerated the pace of cofiring development by increasing the testing activities plus the support activities for interpreting test results. Past tests conducted and analyzed include the Allen Fossil Plant and Seward Generating Station programs. On-going tests include the Colbert Fossil Plant precommercial test program, the Greenidge Station commercialization program, and the Blount St. Station switchgrass program. Tests in the formative stages included the NIPSCO cofiring test at Michigan City Generating Station. Analytical activities included modeling and related support functions required to analyze the cofiring test results, and to place those results into context. Amongmore » these activities is the fuel availability study in the Pittsburgh, PA area. This study, conducted for Duquesne Light, supports their initial investigation into reburn technology using wood waste as a fuel. This Quarterly Report, covering the third quarter of the FETC/EPRI Biomass Cofiring Program, highlights the progress made on the 16 projects funded under this cooperative agreement.« less