Life cycle costs for disposal and assured isolation of low-level radioactive waste in Connecticut
This document presents life cycle costs for a low-level radioactive disposal facility and a comparable assured isolation facility. Cost projections were based on general plans and assumptions, including volume projections and operating life, provided by the Connecticut Hazardous Waste Management Service, for a facility designed to meet the State`s needs. Life cycle costs include the costs of pre-construction activities, construction, operations, closure, and post-closure institutional control. In order to provide a better basis for understanding the relative magnitude of near-term costs and future costs, the results of present value analysis of ut-year costs are provided.
- Research Organization:
- Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC07-94ID13223
- OSTI ID:
- 663357
- Report Number(s):
- DOE/LLW-246; ON: DE98054115; TRN: 99:000042
- Resource Relation:
- Other Information: PBD: Mar 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Waste Management facilities cost information: System Cost Model Software Quality Assurance Plan. Revision 2
The System Cost Model: A tool for life cycle cost and risk analysis
Life cycle cost estimation and systems analysis of Waste Management Facilities
Technical Report
·
Thu Feb 01 00:00:00 EST 1996
·
OSTI ID:663357
The System Cost Model: A tool for life cycle cost and risk analysis
Conference
·
Mon Apr 01 00:00:00 EST 1996
·
OSTI ID:663357
+1 more
Life cycle cost estimation and systems analysis of Waste Management Facilities
Conference
·
Sun Oct 01 00:00:00 EDT 1995
·
OSTI ID:663357