Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Task 3. Recommendations for improvement of equipment qualification methodology and criteria. Volume 3
Technical Report
·
OSTI ID:6623517
The Research Program for Seismic Qualification of Nuclear Plant Electrical and Mechanical Equipment has spanned a period of three years and resulted in seven technical summary reports, each of which covered in detail the findings of different tasks and subtasks, and have been combined into five NUREG/CR volumes. Volume 3 presents recommendations for improvement of equipment qualification methodology and procedural clarification/modification. The fifth category identifies issues where adequate information does not exist to allow a recommendation to be made.
- Research Organization:
- Southwest Research Inst., San Antonio, TX (USA)
- OSTI ID:
- 6623517
- Report Number(s):
- NUREG/CR-3892-Vol.3; ON: TI84901658
- Resource Relation:
- Other Information: Portions are illegible in microfiche products
- Country of Publication:
- United States
- Language:
- English
Similar Records
Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Task 2. Correlation of methodologies for seismic qualification tests of nuclear plant equipment. Volume 2
Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Part I. Survey of methods for equipment and components. Part II. Evaluation of methodology. Part III. Qualification methodology for line mounted equipment. Volume 1
Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Task 4. Use of fragility in seismic design of nuclear plant equipment. Volume 4
Technical Report
·
Wed Aug 01 00:00:00 EDT 1984
·
OSTI ID:6623517
Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Part I. Survey of methods for equipment and components. Part II. Evaluation of methodology. Part III. Qualification methodology for line mounted equipment. Volume 1
Technical Report
·
Wed Aug 01 00:00:00 EDT 1984
·
OSTI ID:6623517
+2 more
Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Task 4. Use of fragility in seismic design of nuclear plant equipment. Volume 4
Technical Report
·
Wed Aug 01 00:00:00 EDT 1984
·
OSTI ID:6623517