Title: Bench-scale testing of on-line control of column flotation using a novel analyzer

Abstract

This document contains the first quarterly technical progress report for PTI's Bench-Scale Testing Project of a circuit integrating PTI's KEN-FLOTETM Column Flotation Technology and PTI's On-Line Quality Monitor Control System. The twelve-month project will involve installation of a 300 lb/hr. bench-scale testing circuit at PETC's Coal Preparation Process Research Facility (CPPRF) and testing of two bituminous coals (Upper Freeport and Pittsburgh No. 8 Seam Raw Coals). Figure 1 contains the project plan as well as the approach to completing the major tasks within the twelvemonth project. The project is broken down into three phases, which include: Phase I - Preparation: The preparation phase was performed principally at PTI's Calumet offices from October through December, 1992. It involved building of the equipment and circuitry, as well as some preliminary design and equipment testing. Phase II - ET Circuit Installation and Testing: This installation and testing phase of the project will be performed at PETC's CPPRF from January through May, 1993, and will be the major focus of the project. It will involve testing of the continuous 300 lb/hr. circuit. Phase II - Project Finalization: The project finalization phase will occur from June through September, 1993, at PTI's Calumet offices and willmore » involve finalizing analytical work and data evaluation, as well as final project reporting. This quarterly progress report principally summarizes the results from the Phase I preparation work and the plan for the early portions of the Phase 11 installation and commissioning, which will occur in January and the first week of February, 1993.« less

Publication Date:
Research Org.:
Process Technology, Inc., Calumet, MI (United States)
Sponsoring Org.:
USDOE; USDOE, Washington, DC (United States)
OSTI Identifier:
6563252
Report Number(s):
DOE/PC/92207-T1
ON: DE93015051
DOE Contract Number:
AC22-92PC92207
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
01 COAL, LIGNITE, AND PEAT; COAL PREPARATION; FLOTATION; TEST FACILITIES; ON-LINE CONTROL SYSTEMS; PERFORMANCE TESTING; MONITORING; PLANNING; PROGRESS REPORT; CONTROL SYSTEMS; DOCUMENT TYPES; ON-LINE SYSTEMS; SEPARATION PROCESSES; TESTING; 010300* - Coal, Lignite, & Peat- Preparation- (1987-)

Citation Formats

Not Available. Bench-scale testing of on-line control of column flotation using a novel analyzer. United States: N. p., 1992. Web. doi:10.2172/6563252.
Not Available. Bench-scale testing of on-line control of column flotation using a novel analyzer. United States. doi:10.2172/6563252.
Not Available. Wed . "Bench-scale testing of on-line control of column flotation using a novel analyzer". United States. doi:10.2172/6563252. https://www.osti.gov/servlets/purl/6563252.
@article{osti_6563252,
title = {Bench-scale testing of on-line control of column flotation using a novel analyzer},
author = {Not Available},
abstractNote = {This document contains the first quarterly technical progress report for PTI's Bench-Scale Testing Project of a circuit integrating PTI's KEN-FLOTETM Column Flotation Technology and PTI's On-Line Quality Monitor Control System. The twelve-month project will involve installation of a 300 lb/hr. bench-scale testing circuit at PETC's Coal Preparation Process Research Facility (CPPRF) and testing of two bituminous coals (Upper Freeport and Pittsburgh No. 8 Seam Raw Coals). Figure 1 contains the project plan as well as the approach to completing the major tasks within the twelvemonth project. The project is broken down into three phases, which include: Phase I - Preparation: The preparation phase was performed principally at PTI's Calumet offices from October through December, 1992. It involved building of the equipment and circuitry, as well as some preliminary design and equipment testing. Phase II - ET Circuit Installation and Testing: This installation and testing phase of the project will be performed at PETC's CPPRF from January through May, 1993, and will be the major focus of the project. It will involve testing of the continuous 300 lb/hr. circuit. Phase II - Project Finalization: The project finalization phase will occur from June through September, 1993, at PTI's Calumet offices and will involve finalizing analytical work and data evaluation, as well as final project reporting. This quarterly progress report principally summarizes the results from the Phase I preparation work and the plan for the early portions of the Phase 11 installation and commissioning, which will occur in January and the first week of February, 1993.},
doi = {10.2172/6563252},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Jan 22 00:00:00 EST 1992},
month = {Wed Jan 22 00:00:00 EST 1992}
}

Technical Report:

Save / Share:
  • The main advantage of the project is that it allowed PTI to gain knowledge and experience about the proper approach, methods and hardware required to properly optimize and control column flotation performance. Many operational problems were incurred during the project, some of that PTI was able to solve during the project and other that must be overcome as the technology is further developed and commercialized. The key operating problems experienced with the KEN-FLOTE{sup TM} Column that must be further researched and overcome include: (1)The low concentrate solids content which limited the throughput capacity of the column, due to high frothmore » washing requirements. The low concentrate solids content also lead to difficulty obtaining accurate On-Line Monitor measurements, due to the poor measurement sensitivity obtained with low solids content samples (particularly less than 5.0 wt %). (2) The higher-than-anticipated reagent dosages that undoubtedly contributed to the low solids content listed above, and also caused foaming problems within PTI`s On-Line Monitor. A defoaming reagent addition (Nalco 7810) was required to provide consistent sample size and reproducible On-Line Monitor counts for the concentrate samples collected within the circuit. PTI and UK`s CAER staff will continue to research alternative column design, particularly alternative air bubble generation and air distribution systems, to try to maximize column concentrate solids content while reducing reagent dosage requirements. In addition to the KEN-FLOTE{sup TM} Column operation there were also a number of hardware problems with PTI`s On-Line Quality Monitor that must be remedied for future commercial installations.« less
  • This document contains the first quarterly technical progress report for PTI`s Bench-Scale Testing Project of a circuit integrating PTI`s KEN-FLOTETM Column Flotation Technology and PTI`s On-Line Quality Monitor Control System. The twelve-month project will involve installation of a 300 lb/hr. bench-scale testing circuit at PETC`s Coal Preparation Process Research Facility (CPPRF) and testing of two bituminous coals (Upper Freeport and Pittsburgh No. 8 Seam Raw Coals). Figure 1 contains the project plan as well as the approach to completing the major tasks within the twelvemonth project. The project is broken down into three phases, which include: Phase I - Preparation:more » The preparation phase was performed principally at PTI`s Calumet offices from October through December, 1992. It involved building of the equipment and circuitry, as well as some preliminary design and equipment testing. Phase II - ET Circuit Installation and Testing: This installation and testing phase of the project will be performed at PETC`s CPPRF from January through May, 1993, and will be the major focus of the project. It will involve testing of the continuous 300 lb/hr. circuit. Phase II - Project Finalization: The project finalization phase will occur from June through September, 1993, at PTI`s Calumet offices and will involve finalizing analytical work and data evaluation, as well as final project reporting. This quarterly progress report principally summarizes the results from the Phase I preparation work and the plan for the early portions of the Phase 11 installation and commissioning, which will occur in January and the first week of February, 1993.« less
  • This document contains the second quarterly technical progress report for PTI`s Bench-Scale Testing Project of a circuit integrating PTI`s KEN-FLOTE{trademark} Column Flotation Technology and PTI`s On-Line Quality Monitor and Control System. The twelve-month project involves installation and testing of a 200--300 lb/hr. bench-scale testing circuit at PETC`s Coal Preparation Process Research Facility (CPPRF) for two bituminous coals (Upper Freeport and Pittsburgh No. 8 Seam Raw Coals). The project schedule timeline by task series for the twelve month project, as it was laid out in the initial Project Work Plan. At the present time, all tasks are progressing according to schedulemore » with the exception of the Task 800 Circuit Testing and Sample Prep and Task 1000 Circuit Decommissioning, which have slipped approximately five weeks due to delays incurred within in the project.« less
  • This document contains the third quarterly technical progress report for PTI`s Bench-Scale Testing Project of a circuit integrating PTI`s KEN-FLOTETM Column Flotation Technology and PTI`s On-Line Quality Monitor and Control System. The twelve-month project involves installation and testing of a 200--300 lb/hr. bench-scale flotation circuit at PETC`s Coal Preparation Process Research Facility (CPPRF) for two bituminous coals (Upper Freeport and Pittsburgh No. 8 Seam Raw Coals). Figure 1 contains the project plan, as well as the approach to completing the major tasks within the twelve-month project schedule. The project is broken down into three phases, which include: Phase I --more » Preparation: The preparation phase was performed principally at PTI`s Calumet offices from October through December, 1992. It involved building of the equipment and circuitry, as well as some preliminary design and equipment testing; Phase II -- ET Circuit Installation and Testing: This installation and testing phase of the project was performed at PETC`s CPPRF from January through June, 1993, and was the major focus of the project. It involved testing of the continuous 200--300 lb/hr. circuit; and Phase III -- Project Finalization: The project finalization phase is occurring from July through September, 1993, at PTI`s Calumet offices and involves finalizing analytical work and data evaluation, as well as final project reporting. This Third Quarterly Technical Progress Report principally summarizes the results from the benchscale testing with the second coal (Pittsburgh No. 8 Seam Coal), which occurred in April through June, 1993. It also contains preliminary economic evaluations that will go into the Final Report, as well as the plan for the final reporting task.« less