Development of flaw evaluation and acceptance procedures for flaw indications in the cooling water system at the Savannah River Site K Reactor
- Westinghouse Electric Corp., Pittsburgh, PA (United States)
- Westinghouse Savannah River Co., Aiken, SC (United States)
This paper describes the methodology used in determining the criteria for acceptance of inspection indications in the K-Reactor Cooling Water System at the Savannah River Plant. These criteria have been developed in a manner consistent with the development of similar criteria in the ASME Code Section 11 for commercial light water reactors, but with a realistic treatment of the operating conditions in the cooling water system. The technical basis for the development of these criteria called [open quotes]Acceptance Standards[close quotes] is contained in this paper. A second portion of this paper contains the methodology used in the construction of flaw evaluation charts which have been developed for each specific line size in the cooling water system. The charts provide the results of detailed fracture mechanics calculations which have been completed to determine the largest flaw which can be accepted in the cooling water system without repair. These charts are designed for use in conjunction with inservice inspections of the cooling water system, and only require inspection results to determine acceptability.
- Research Organization:
- Westinghouse Savannah River Co., Aiken, SC (United States)
- Sponsoring Organization:
- USDOE; USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC09-89SR18035
- OSTI ID:
- 6503294
- Report Number(s):
- WSRC-MS-93-262; CONF-930702-45; ON: DE93014731
- Resource Relation:
- Conference: Pressure vessels and piping conference, Denver, CO (United States), 25-29 Jul 1993
- Country of Publication:
- United States
- Language:
- English
Similar Records
In-service Inspection Ultrasonic Testing of Reactor Pressure Vessel Welds for Assessing Flaw Density and Size Distribution per 10 CFR 50.61a, Alternate Fracture Toughness Requirements
Development of J-integral based UT flaw acceptance criteria for Savannah River reactor tanks
Related Subjects
K REACTOR
REACTOR COOLING SYSTEMS
DEFECTS
FRACTURE MECHANICS
HEAT TRANSFER
HYDRAULICS
INSPECTION
LEAKS
PIPES
REACTOR SAFETY
STANDARDS
WATER COOLED REACTORS
WELDED JOINTS
COOLING SYSTEMS
ENERGY TRANSFER
FLUID MECHANICS
HEAVY WATER MODERATED REACTORS
JOINTS
MECHANICS
PRODUCTION REACTORS
REACTOR COMPONENTS
REACTORS
SAFETY
SPECIAL PRODUCTION REACTORS
220600* - Nuclear Reactor Technology- Research
Test & Experimental Reactors
210500 - Power Reactors
Breeding