Functional design criteria, Project W-211, Initial Tank Retrieval Systems. Revision 1
This document provides the technical baseline for retrieval of waste from ten double-shell tanks in the SY, AN, AP, AW, AY, and AZ tank farms. In order to retrieve waste from these tanks, systems are needed to mix the sludge with the supernate and pump the waste mixture from the tank. For 101-SY, the existing mitigation pump will be used to mix the waste and Project W-211 will provide for waste removal. The retrieval scope for the other nine tanks includes both the waste mixing and removal functions.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 65029
- Report Number(s):
- WHC-SD-W211-FDC-001-Rev.1; ON: DE95007197; TRN: 95:014059
- Resource Relation:
- Other Information: PBD: 7 Feb 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Project W-211 initial tank retrieval systems year 2000 compliance assessment project plan
Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)
Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)
Technical Report
·
Tue Aug 24 00:00:00 EDT 1999
·
OSTI ID:65029
Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)
Technical Report
·
Wed Apr 19 00:00:00 EDT 2000
·
OSTI ID:65029
Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)
Technical Report
·
Thu Sep 02 00:00:00 EDT 1999
·
OSTI ID:65029